Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rectification Of Existing Pa Fan Motor Concrete Bed Of Unit 1 1 B And Dismantling Partition Wall In Between Mill Floor And Bottom Ash Hopper Of Unit 1
|
| Description |
Rectification Of Existing Pa Fan Motor Concrete Bed Of Unit 1 1 B And Dismantling Partition Wall In Between Mill Floor And Bottom Ash Hopper Of Unit 1
|
| Organisation | TNEB Limited | TANGEDCO | CE-TTPS - TANGEDCO | SE-Civil-TTPS - TANGEDCO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 1800 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | October 13, 2026 23:30 |
| End Date |
Open
27/10/2026
13 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of selling agency for disposal of dry fly ash, gypsum, cenosphere, pond/bottom ash, coal mill rejects etc and all categories of surplus materials, scrap, etc for three (03) years
Engagement of selling agency for disposal of dry fly ash, gypsum, cenosphere, pond/bottom ash, coal mill rejects etc and all categories of surplus materials, scrap, etc for three (03) years
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreTtps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreof your Industry type