Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Esp Bottom Ash Hopper
|
| Description |
Overhauling Of Flushing Apparatus Jetting Nozzles, Valves, Nozzle Body Etc Of Esp System Of Unit 1, 3 X210 Mw, Atps Anpara.
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_RVUNL_813811_1 |
|
Reference Number |
03/AHD/OMC-I/ATPS/2023-24 |
| Tender Fee | 590 |
| EMD | 20000 |
| Tender Value | - |
| Place | SE OMC-I ATPS ANPARA |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | June 21, 2023 15:30 |
| End Date |
Expired
29/07/2023
Expired 1173 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Read moreTtps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read more200 nb hopper isolation plate valve for esp 1000075417
200 nb hopper isolation plate valve for esp 1000075417
Read moreSelf cleaning idlers for bac,return flat idlers for bottom ash conveyors,carrying idlers for bottom ash conveyors
Self cleaning idlers for bac,return flat idlers for bottom ash conveyors,carrying idlers for bottom ash conveyors
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreSupply of heaters for esp hoppers, silo and ash handling plant
Supply of heaters for esp hoppers, silo and ash handling plant
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreTtps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreof your Industry type