Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Hearing Aids In Ent Department (Rate Contract For 2 Years)
|
Description |
Supply Of Hearing Aids In Ent Department (Rate Contract For 2 Years)
|
Organisation | S.P. Medical college, Bikaner | State Govt. and UT |
Tender Id | 2025_SPMCB_454229_1 |
Reference Number |
SOENIB 17 (2024-25) ITEM 2 |
Tender Fee | 2500 |
EMD | 1.6 Lakh |
Tender Value | |
Place | MEMBER SECRETARY, RMRS, PBM HOSPITAL, BIKANER |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=815378 |
Start Date | April 01, 2025 21:30 |
End Date |
21/04/2025 ( Expired 2 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreTender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreRequest for proposal (rfp) for operationalization of mmv
Request for proposal (rfp) for operationalization of mobile medical vans in haryana
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConsultancy services for preparation of dpr for construction of buxar bhagalpur high speed corridor expressway in the state of bihar
Consultancy services for preparation of dpr for construction of buxar bhagalpur high speed corridor expressway in the state of bihar
Read moreCs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreof your Industry type