Tender Details

Particulars Details
Title
Supply, Installation & Nlcil Branding Of Solar Street Lights In All Villages Under Jharsuguda Block
Description
Supply, Installation & Nlcil Branding Of Solar Street Lights In All Villages Under Jharsuguda Block
Organisation Neyveli Lignite Corporation Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2000
EMD 6.34 Lakh
Tender Value
Place ODISHA
Link

AAAAAAAAAA

Login to view
Start Date May 22, 2025 16:30
End Date

19/06/2025 ( 5 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server

Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server

Read more
Design, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp

Design, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp

Read more
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511

Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more
Package-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp

Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf

Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise