Work Of Construction Of 02 Nos. Fire Hut In Switchyard For Safety Of Fire Hezards Of 40 Mva T/F And 63 Mva T/F At 132 Kv S/S Rudrapur Under Etd, Deoria
|
Description |
Work Of Construction Of 02 Nos. Fire Hut In Switchyard For Safety Of Fire Hezards Of 40 Mva T/F And 63 Mva T/F At 132 Kv S/S Rudrapur Under Etd, Deoria
|
Organisation | UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT |
Tender Id | 2024_UPTCL_879630_1 |
Reference Number |
E-Tender No. 63-ETC(G)/2023-24 |
Tender Fee | 590 |
EMD | 2000 |
Tender Value | |
Place | Gorakhpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1501993 |
Start Date | January 10, 2024 22:45 |
End Date |
05/02/2024 ( Expired 464 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreGravelling work at 132 kv switch yard of chandil substation and 33 kv s-y of jamshedpur substation under gomd-iii, dvc, jamshedpur
Gravelling work at 132 kv switch yard of chandil substation and 33 kv s-y of jamshedpur substation under gomd-iii, dvc, jamshedpur
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreConstruction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Read moreConstruction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Construction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Read moreSupply and refilling work of sf6 gas cylinder at various 400/220/132 kv sub station under electricity transmission circle banda.