Tender Details

Particulars Details
Title
Job 8 Restoration Of Rain Damages Of Link Road To Village Upper Arniala Via Bazigar Mohalla Km 0 0 To 3 0 Sub Head Providing, Laying Wmm And Bc At Rd 0 0 To 0 045 And Retaining Wall Mc Una Deposit Work
Description
Job 8 Restoration Of Rain Damages Of Link Road To Village Upper Arniala Via Bazigar Mohalla Km 0 0 To 3 0 Sub Head Providing, Laying Wmm And Bc At Rd 0 0 To 0 045 And Retaining Wall Mc Una Deposit Work
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_85562_1
Reference
Number
Job 8 Restoration of rain Damages of link road to Village Upper Arniala via Bazigar Mohalla km 0-0 t
Tender Fee 500
EMD 11500
Tender Value
Place Una
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=127272
Start Date February 10, 2024 14:30
End Date

15/02/2024 ( Expired 490 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Restoration of rain damages on sarahan haripur road km. 0/00 to 10/500 (sh c/o dry stone masonary r/wall at rd 4/210 to 4/230) sdf/2024/858

Restoration of rain damages on sarahan haripur road km. 0/00 to 10/500 (sh c/o dry stone masonary r/wall at rd 4/210 to 4/230) sdf/2024/858

Read more
Restoration of rain damages on nihari to dadhol kallan road km 0/00 to 3/00 sh c/o r/wall at rd 1/275 to 1/305.

Restoration of rain damages on nihari to dadhol kallan road km 0/00 to 3/00 sh c/o r/wall at rd 1/275 to 1/305.

Read more
Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u

Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u

Read more
Job 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u

Job 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u

Read more
Restoration of rain damages on badehar khui pekhubela road km.0.0 to 3.600 (sh c.o retaining wall in rd.2.400 to 2.450 lhs earthern shoulder in rd.0.500 to 2.0 both side ) (dc deposit work)

Restoration of rain damages on badehar khui pekhubela road km.0.0 to 3.600 (sh c.o retaining wall in rd.2.400 to 2.450 lhs earthern shoulder in rd.0.500 to 2.0 both side ) (dc deposit work)

Read more
Restoration of rain damages on link road sasan lamlehra pekhubela road km.0.0 to 2.800 (sh c/o retaining wall in rd.2.700 to 2.785) (dc deposit work)

Restoration of rain damages on link road sasan lamlehra pekhubela road km.0.0 to 2.800 (sh c/o retaining wall in rd.2.700 to 2.785) (dc deposit work)

Read more
Restoration of rain damages behdala jankour via abada barana road km.0.0 to 4.600 (sh c.o r. wall along road rhs rd.0.940 to 0.966) (dc deposit work)

Restoration of rain damages behdala jankour via abada barana road km.0.0 to 4.600 (sh c.o r. wall along road rhs rd.0.940 to 0.966) (dc deposit work)

Read more
Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)

Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)

Read more
Repair of restoration of rain damage on link road from ther to village chandrehar in g.p ther under sdrf deposit work sh construction of pcc retaining wall at rd. 0.710 to 0.721.50

Repair of restoration of rain damage on link road from ther to village chandrehar in g.p ther under sdrf deposit work sh construction of pcc retaining wall at rd. 0.710 to 0.721.50

Read more
Improvement and widening of road from gondpur behli to bathu gurplah including bridge over gondpur jaichand khad km. 0-0 to 8-655 sub head imp. retaining wall., missing cd, gsb,wmm tarring work, side drain, paver block, c.c pavement and parapet incl

Improvement and widening of road from gondpur behli to bathu gurplah including bridge over gondpur jaichand khad km. 0-0 to 8-655 sub head imp. retaining wall., missing cd, gsb,wmm tarring work, side drain, paver block, c.c pavement and parapet incl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise