Tender Details
About Tender
🏭 Tender Announcement: Main Steam Stop Valve Replacement At Mtps I Tm Unit I 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Replacement Of Defective Main Steam Stop Valves At The Turbine End Of Mtps I Tm Unit I, As Per Indian Bureau Of Standards (Ibr) Specifications. The Scope Of Work Includes The Drawl Of Reconditioned Valves From Stores, Lifting, Erection, Alignment, Ibr Welding, And Stress Relief. 📅 Bid Submission Deadline: April 25, 2024, 2:00 Pm A Tender Fee Of Inr 14,800 Is Applicable. Interested Bidders Must Submit Detailed Proposals, Including Compliance With Ibr Specifications, Methodology For Valve Reconditioning, And A Comprehensive Project Execution Plan. Keywords: Tneb Limited, Main Steam Stop Valves, Power Station, Ibr Specification, Turbine, Valve Replacement, Project Execution, Government Tender, EmdParticulars | Details |
---|---|
Title |
Mtps I Tm Unit I Replacing The Defective Main Steam Stop Valves Left And Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment Ibr Welding Stress Relieving Of Valves
|
Description |
Mtps I Tm Unit I Replacing The Defective Main Steam Stop Valves Left And Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment Ibr Welding Stress Relieving Of Valves
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_429704_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 505 / 2023-24 |
Tender Fee | 0 |
EMD | 14800 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=510870 |
Start Date | February 23, 2024 22:30 |
End Date |
25/04/2024 ( Expired 395 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Read moreMtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment
Read moreMtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Read moreMtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line
Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv
Read moreof your Industry type