Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtpsi Tm Uniti Replacing The Defective Main Steam Stop Valves Left Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment Ibr Welding Stress Relieving Of Valves
|
| Description |
Mtpsi Tm Uniti Replacing The Defective Main Steam Stop Valves Left Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment Ibr Welding Stress Relieving Of Valves
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_557044_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 89 / 2025-26 |
| Tender Fee | 0 |
| EMD | 17900 |
| Tender Value | |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=665341 |
| Start Date | May 12, 2025 22:00 |
| End Date |
Expired
26/05/2025
Expired 382 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Read moreMtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment
Read moreMtps i bm boiler pressure parts reconditioning of defective main steam stop valve mssv 350 nb left right at boiler end with build up ends in unit iv
Mtps i bm boiler pressure parts reconditioning of defective main steam stop valve mssv 350 nb left right at boiler end with build up ends in unit iv
Read moreof your Industry type