Tender Details

Particulars Details
Title
Mtpsi Tm Uniti Replacing The Defective Main Steam Stop Valves Left Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment Ibr Welding Stress Relieving Of Valves
Description
Mtpsi Tm Uniti Replacing The Defective Main Steam Stop Valves Left Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment Ibr Welding Stress Relieving Of Valves
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_557044_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT. 89 / 2025-26
Tender Fee 0
EMD 17900
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=665341

Start Date May 12, 2025 22:00
End Date
Expired 26/05/2025

Expired 382 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Read more
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment

Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment

Read more
Mtps i bm boiler pressure parts reconditioning of defective main steam stop valve mssv 350 nb left right at boiler end with build up ends in unit iv

Mtps i bm boiler pressure parts reconditioning of defective main steam stop valve mssv 350 nb left right at boiler end with build up ends in unit iv

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise