Tender Details

Particulars Details
Title
Mtps I Tm Unit I Replacing The Defective Main Steam Stop Valves Left And Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment
Description
Mtps I Tm Unit I Replacing The Defective Main Steam Stop Valves Left And Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_453713_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT. 17/ 2024-25
Tender Fee 0
EMD 16600
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539927
Start Date June 12, 2024 17:30
End Date

26/06/2024 ( Expired 333 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Read more
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Read more
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Read more
Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026

Read more
Mtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2024 25 as and when required basis

Mtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2024 25 as and when required basis

Read more
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha

Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha

Read more
Mtps i tm unit ii capital overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during capital overhauling 2024 25

Mtps i tm unit ii capital overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during capital overhauling 2024 25

Read more
Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Read more
Mtps i tm unit iv annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during annual overhauling 2024 25

Mtps i tm unit iv annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during annual overhauling 2024 25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise