Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit I Replacing The Defective Main Steam Stop Valves Left And Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment
|
| Description |
Mtps I Tm Unit I Replacing The Defective Main Steam Stop Valves Left And Right At Turbine End As Per Ibr Specification Including Drawl Of Reconditioned Valves From Stores Leading Lifting Erection Alignment
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_453713_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 17/ 2024-25 |
| Tender Fee | 0 |
| EMD | 16600 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539927 |
| Start Date | June 12, 2024 17:30 |
| End Date |
Expired
26/06/2024
Expired 837 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Read moreMtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Mtpsi tm uniti replacing the defective main steam stop valves left right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Read moreSupply of ibr approved steam / bellow seal valves
Supply of ibr approved steam / bellow seal valves
Read moreMtps i tm unit iv replacing the defective valve vdas 122 eroded flash tank-i changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by ibr non ibr
Mtps i tm unit iv replacing the defective valve vdas 122 eroded flash tank-i changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by ibr non ibr
Read moreSupply of ibr steam valves for boiler of class 300.
Supply of ibr steam valves for boiler of class 300.
Read moreMtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Read moreMtps i tm unit ii transporting the valves from central store replacing the defective extraction steam to hp heaters 5 6 isolation valves es 5 es 6 mc 29 mc nrv deaerator floor bfp suction valves 2c ca 24 eroded drip line reducers
Mtps i tm unit ii transporting the valves from central store replacing the defective extraction steam to hp heaters 5 6 isolation valves es 5 es 6 mc 29 mc nrv deaerator floor bfp suction valves 2c ca 24 eroded drip line reducers
Read moreSupply of ibr quality steam valves on door delivery basis at hbl plant sugauli
Supply of ibr quality steam valves on door 
 delivery basis at hbl plant sugauli
Read moreof your Industry type