Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Pcc Flooring Work For Rchp Conveyor Belts 🚢 Eastern Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Execution Of Pcc (Premixed Concrete) Flooring Work At The Tail End Of C 18 And C 19 Conveyor Belts Under The Ranchi Coal Handling Plant (Rchp). 🛠️ 📍 Location: Rajmahal Chp Bid Submission Deadline: June 17, 2024, 6:55 Pm (Gmt+5:30) Tender Fee: Inr 0 Emd: Inr 21,300 Interested Bidders Must Demonstrate Their Capability To Perform The Work As Per The Specifications And Standards Required For This Project. Detailed Bids, Including Method Statements, Work Schedules, And Financial Proposals, Are To Be Submitted By The Stipulated Deadline. Keywords: Pcc Flooring, Conveyor Belt, Rchp, Eastern Coalfields Limited, Public Sector Undertaking, Construction, Bid Submission, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Pcc Flooring Work In Tail End Of C 18 And C 19 Conveyor Belt Under Rchp.
|
| Description |
Pcc Flooring Work In Tail End Of C 18 And C 19 Conveyor Belt Under Rchp.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_309912_1 |
|
Reference Number |
ECL/RJML/AGM/AE(C)/ e-Ten/24-25/05 Dt-06.06.2024 |
| Tender Fee | 0 |
| EMD | 21300 |
| Tender Value | - |
| Place | Rajmahal CHP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321105 |
| Start Date | June 07, 2024 00:25 |
| End Date |
Expired
17/06/2024
Expired 831 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pcc flooring work in tail end of c-18 and c-19 conveyor belt under rchp.(2nd call).
Pcc flooring work in tail end of c-18 and c-19 conveyor belt under rchp.(2nd call).
Read morePcc flooring work in tell end of c-18 and c-19 conveyor belt at rchp.
Pcc flooring work in tell end of c-18 and c-19 conveyor belt at rchp.
Read moreProviding and fixing cgi sheet in place of missed/damaged cgi sheet from interim btl crusher to conveyor c 18 and c 19 under rchp.
Providing and fixing cgi sheet in place of missed/damaged cgi sheet from interim btl crusher to conveyor c 18 and c 19 under rchp.
Read moreMaintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Maintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Read moreMaintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Maintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Read moreMaintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Maintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Read moreof your Industry type