Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance/ Repairing Of Tail Drum, Tail End Conveyor Structure Along With Tail End Base Structure Of Picking Belt No.2 Of Rom Section Of Bhojudih Coal Washery.
|
| Description |
Maintenance/ Repairing Of Tail Drum, Tail End Conveyor Structure Along With Tail End Base Structure Of Picking Belt No.2 Of Rom Section Of Bhojudih Coal Washery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_282141_1 |
|
Reference Number |
DCE/BJ/18(M)/23-24/032 |
| Tender Fee | - |
| EMD | 5700 |
| Tender Value | - |
| Place | OFFICE OF THE PROJECT OFFICER, BCW, SANTALDIH,WB |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | June 24, 2023 14:30 |
| End Date |
Expired
05/07/2023
Expired 1197 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreChanging of tail end drum of 22 l belt, changing of discharge drum of 1 dip and 4 dip 1st belt and installation of 1000 mm double drive belt in t-18 panel for jhilimili ug mine of jhilimili sub area.
Changing of tail end drum of 22 l belt, changing of discharge drum of 1 dip and 4 dip 1st belt and installation of 1000 mm double drive belt in t-18 panel for jhilimili ug mine of jhilimili sub area.
Read moreMaintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Maintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Read moreMaintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Maintenance/ repairing of tail drum, tail end conveyor structure along with tail end base structure of picking belt no.2 of rom section of bhojudih coal washery.
Read moreRepairing of technological structure of platform and base of conveyor belt rom picking belt no. 1 of rom section of bhojudih coal washery.
Repairing of technological structure of platform and base of conveyor belt rom picking belt no. 1 of rom section of bhojudih coal washery.
Read moreRepairing of tail drum structure of horizontal belt conveyor of bhojudih coal washery
Repairing of tail drum structure of horizontal belt conveyor of bhojudih coal washery
Read moreRepairing of tail drum structure of horizontal belt conveyor of bhojudih coal washery.
Repairing of tail drum structure of horizontal belt conveyor of bhojudih coal washery.
Read morePrive maintenanace of tail end structure along with drum and base structure of gathering belt no.1 at bhojudih coal washery.
Prive maintenanace of tail end structure along with drum and base structure of gathering belt no.1 at bhojudih coal washery.
Read morePreventive maintenanace of tail end structure along with drum and base structure of gathering belt no.1 at bhojudih coal washery.
Preventive maintenanace of tail end structure along with drum and base structure of gathering belt no.1 at bhojudih coal washery.
Read moreof your Industry type