Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Fabrication Erection N Alignment Of Existing Cable Trench With Providing And Fixing In The Gallery Of 301 B C 401 B C Ps 3 Ps 1 2 And Ps 4 Electrical Section Of Rajrappa Washery Project
|
| Description |
Dismantling Fabrication Erection N Alignment Of Existing Cable Trench With Providing And Fixing In The Gallery Of 301 B C 401 B C Ps 3 Ps 1 2 And Ps 4 Electrical Section Of Rajrappa Washery Project
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_341100_1 |
|
Reference Number |
GM(R)/ SO(W)/Rjp/25-26/Et/60 dt 07.08.25 |
| Tender Fee | 0 |
| EMD | 7300 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=353590 |
| Start Date | August 08, 2025 23:30 |
| End Date |
Expired
19/08/2025
Expired 423 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreDismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.
Read moreDismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery
Dismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
 
Read moreDismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Read moreDismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery
Dismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreProviding , dismantling, fabrication, erection and alignment of damage structure and shade of head drum of 1204 and 1304 and between silo 8 and 9 at loading section of rajrappa washery
Providing , dismantling, fabrication, erection and alignment of damage structure and shade of head drum of 1204 and 1304 and between silo 8 and 9 at loading section of rajrappa washery
Read moreof your Industry type