Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Fabrication, Erection N Alignment Of Underflow And Overflow Chutes Of Apron Grizzly, Two Way Discharge Chutes Of 301 A N B Belts And The Other Jobs As Per Requirement Under Raw Coal Section Of Rajrappa Washery
|
| Description |
Dismantling, Fabrication, Erection N Alignment Of Underflow And Overflow Chutes Of Apron Grizzly, Two Way Discharge Chutes Of 301 A N B Belts And The Other Jobs As Per Requirement Under Raw Coal Section Of Rajrappa Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_329710_1 |
|
Reference Number |
GM(R)/ SO(W)/Rjp/24-25/Et/151 dt 20.02.25 |
| Tender Fee | 0 |
| EMD | 7200 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341793 |
| Start Date | February 21, 2025 23:30 |
| End Date |
Expired
03/03/2025
Expired 553 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery
Dismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery
Read moreDismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreReplacement of crusher segments primary n secondary crushers both a n b side flow n dismantling fabrication erection and alignment of hopper grizzly under raw coal section of rwp
Replacement of crusher segments primary n secondary crushers both a n b side flow n dismantling fabrication erection and alignment of hopper grizzly under raw coal section of rwp
 
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
 
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreDismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 b c 401 b c ps 3 ps 1 2 and ps 4 electrical section of rajrappa washery project
Dismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 b c 401 b c ps 3 ps 1 2 and ps 4 electrical section of rajrappa washery project
Read moreRehabilitation of gear boxes installed at unit 504 and 301-b conveyor belts along with their re-alignment at raw coal section of moonidih coal washery.
Rehabilitation of gear boxes installed at unit 504 and 301-b conveyor belts along with their re-alignment at raw coal section of moonidih coal washery.
Read moreProviding, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Read moreof your Industry type