Tender Details

Particulars Details
Title
Dismantling, Fabrication, Erection N Alignment Of Underflow And Overflow Chutes Of Apron Grizzly, Two Way Discharge Chutes Of 301 A N B Belts And The Other Jobs As Per Requirement Under Raw Coal Section Of Rajrappa Washery
Description
Dismantling, Fabrication, Erection N Alignment Of Underflow And Overflow Chutes Of Apron Grizzly, Two Way Discharge Chutes Of 301 A N B Belts And The Other Jobs As Per Requirement Under Raw Coal Section Of Rajrappa Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_329710_1
Reference
Number
GM(R)/ SO(W)/Rjp/24-25/Et/151 dt 20.02.25
Tender Fee 0
EMD 7200
Tender Value -
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341793

Start Date February 21, 2025 23:30
End Date
Expired 03/03/2025

Expired 553 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery

Dismantling, fabrication, erection and alignment of belt structure and discharge chutes of 406 and 408 belts conveyor under ps-5 main washing plant of rajrappa washery

Read more
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.

Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.

Read more
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
Replacement of crusher segments primary n secondary crushers both a n b side flow n dismantling fabrication erection and alignment of hopper grizzly under raw coal section of rwp

Replacement of crusher segments primary n secondary crushers both a n b side flow n dismantling fabrication erection and alignment of hopper grizzly under raw coal section of rwp&#x0d &#x0d

Read more
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.

Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.

Read more
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project

Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project&#x0d &#x0d

Read more
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Read more
Dismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 b c 401 b c ps 3 ps 1 2 and ps 4 electrical section of rajrappa washery project

Dismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 b c 401 b c ps 3 ps 1 2 and ps 4 electrical section of rajrappa washery project

Read more
Rehabilitation of gear boxes installed at unit 504 and 301-b conveyor belts along with their re-alignment at raw coal section of moonidih coal washery.

Rehabilitation of gear boxes installed at unit 504 and 301-b conveyor belts along with their re-alignment at raw coal section of moonidih coal washery.

Read more
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.

Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.

Read more