Tender Details

Particulars Details
Title
Dismantling, Fabrication, Erection N Alignment Of Underflow And Overflow Chutes Of Apron Grizzly, Two Way Discharge Chutes Of 301 A N B Belts And The Other Jobs As Per Requirement Under Raw Coal Section Of Rajrappa Washery
Description
Dismantling, Fabrication, Erection N Alignment Of Underflow And Overflow Chutes Of Apron Grizzly, Two Way Discharge Chutes Of 301 A N B Belts And The Other Jobs As Per Requirement Under Raw Coal Section Of Rajrappa Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_329710_1
Reference
Number
GM(R)/ SO(W)/Rjp/24-25/Et/151 dt 20.02.25
Tender Fee 0
EMD 7200
Tender Value
Place RAJRAPPA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341793
Start Date February 21, 2025 23:30
End Date

03/03/2025 ( Expired 97 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.

Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.

Read more
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.

Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.

Read more
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.

Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.

Read more
Repairing / reconditioning of the motor controlling pannel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.

Repairing / reconditioning of the motor controlling panel of apron feeder,primary crusher and belt conveyor b side and repairing all the locks of mcc panels door installed at raw coal of rajrappa washery project.

Read more
Dismantling, fabrication, repairing and re-erection of chute from feeder no. 1 and 2 to conveyor a at bhojudih coal washery.

Dismantling, fabrication, repairing and re-erection of chute from feeder no. 1 and 2 to conveyor a at bhojudih coal washery.

Read more
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project

Carriage of spillaged coal from the raw coal section by manual labor including loading unloading &#x0d and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project

Read more
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Read more
Fabrication, dismantling, erection and painting of all types of structural in raw material section, fact - uc.

Fabrication, dismantling, erection and painting of all types of structural in raw material section, fact - uc.

Read more
Fabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of raw coal section at monidih coal washery.

Fabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of raw coal section at monidih coal washery.

Read more
A)dismantling, fitting, repairing and overhauling of u-1400 radicon gear box of new bunkers washed coal repairing and burnt motor replacement and new motor fitting in rlb section of kathara washery b)i) repairing and thorough overhauling of gear box

A)dismantling, fitting, repairing and overhauling of u-1400 radicon gear box of new bunkers washed coal repairing and burnt motor replacement and new motor fitting in rlb section of kathara washery b)i) repairing and thorough overhauling of gear box

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise