Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Fabrication Erection N Alignment Of Tray N Catch Pan Hopper Liner Plate N Motor Base Of Usl Screen Under Main Washing Plant Ps 5 Of Rajrappa Washery Project
|
| Description |
Dismantling Fabrication Erection N Alignment Of Tray N Catch Pan Hopper Liner Plate N Motor Base Of Usl Screen Under Main Washing Plant Ps 5 Of Rajrappa Washery Project

|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_339777_1 |
|
Reference Number |
GM(R)/ SO(W)/Rjp/25-26/Et/51 dt 22.07.25 |
| Tender Fee | 0 |
| EMD | 15300 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=352225 |
| Start Date | July 23, 2025 23:30 |
| End Date |
Expired
01/08/2025
Expired 398 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read moreRepairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreRepairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreProviding, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,
 testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreRepair, fabrication and erection of catch pan (tray) after dismantling of old and damaged screens tray plate, base structure etc. of unit no. 467 in fine coal section of kathara washery
Repair, fabrication and erection of catch pan (tray) after dismantling of old and damaged screens tray plate, base structure etc. of unit no. 467 in fine coal section of kathara washery
Read moreof your Industry type