Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing, Fabrication And Erection Of B Side Hopper Liner, Mother Plates, Hopper Tray(plates, Angles) And B Side Hopper Supporting Structure In Pch Section Of Sawang Washery.
|
| Description |
Repairing, Fabrication And Erection Of B Side Hopper Liner, Mother Plates, Hopper Tray(plates, Angles) And B Side Hopper Supporting Structure In Pch Section Of Sawang Washery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_336603_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/25-26/02 Date 30.05.2025 |
| Tender Fee | 0 |
| EMD | 3200 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348912 |
| Start Date | May 31, 2025 16:30 |
| End Date |
Expired
09/06/2025
Expired 451 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Repairing, fabrication and erection of b side hopper liner, mother plates, hopper tray(plates, angles) and b side hopper supporting structure in pch section of sawang washery.
Read moreOverhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Overhauling of c.i. wheel shaft of a side and b side shuttle conveyor and (b) overhauling of vertical pump in pch section at sawang washery.
Read moreFabrication and erection of steel structure work of a side grizzly in pch section of sawang washery.
Fabrication and erection of steel structure work of a side grizzly in pch section of sawang washery.
Read moreFabrication and erection of steel structure work of a side grizzly in pch section of sawang washery.
Fabrication and erection of steel structure work of a side grizzly in pch section of sawang washery.
Read moreRepairing, fabrication and overhauling of vertical pump at pch section at sawang washery.
Repairing, fabrication and overhauling of vertical pump at pch section at sawang washery.
Read moreDismantling, repairing and overhauling and assembling of pulley of a and b side feeder and pulley of primary crusher in pch section at sawang washery.
Dismantling, repairing and overhauling and assembling of pulley of a and b side feeder and pulley of primary crusher in pch section at sawang washery.
Read moreRepairing of reversible bc, transfer bc and a and b shuttle bc chain sprocket at pch section of sawang washery.
Repairing of reversible bc, transfer bc and a and b shuttle bc chain sprocket at pch section of sawang washery.
Read moreRepairing and overhauling of rom b/c head drum, snub drum and transfer b/c tension drum at pch section of sawang washery.
Repairing and overhauling of rom b/c head drum, snub drum and transfer b/c tension drum at pch section of sawang washery.
Read moreFabrication/erection and repairing of a side hopper plates, structures and feeder discharge chute liner plate change etc. work of p.c.h. section at sawang washery.
Fabrication/erection and repairing of a side hopper plates, structures and feeder discharge chute liner plate change etc. work of p.c.h. section at sawang washery.
Read moreDismantling, repairing, installing, commissioning of eot crane at pch and overhead crane at workshop of sawang washery.
Dismantling, repairing, installing, commissioning of eot crane at pch and overhead crane at workshop of sawang washery.
Read moreof your Industry type