Tender Details
Particulars | Details |
---|---|
Title |
Providing, Fabrication, Erection N Alignment Of Hand Railing By Welding To Steel Ladder Railing Ms Tube 40mm At Top Up Silo Ps 8 N 9 (Wc N Wcp) Bunker At Rajrappa Washery.
|
Description |
Providing, Fabrication, Erection N Alignment Of Hand Railing By Welding To Steel Ladder Railing Ms Tube 40mm At Top Up Silo Ps 8 N 9 (Wc N Wcp) Bunker At Rajrappa Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_301724_1 |
Reference Number |
GM(R)/SO(W)/Rjp/23-24/Et/144dt 19.02.24 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | RAJRAPPA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312562 |
Start Date | February 20, 2024 23:30 |
End Date |
29/02/2024 ( Expired 440 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project
Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project
Read moreFabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery
Read more1) fabrication and erection of 03 nos.drop gate and 03 nos.goal post at akwmc ocp dump.(2) repairing of 10 inch,8 inch dia ms pipe bend and short pieces,reduce fabrication by cutting welding and allied jobs for akwmc ocp at katras area.
1) fabrication and erection of 03 nos.drop gate and 03 nos.goal post at akwmc ocp dump.(2) repairing of 10 inch,8 inch dia ms pipe bend and short pieces,reduce fabrication by cutting welding and allied jobs for akwmc ocp at katras area.
Read moreProviding, dismantling, repairing, fabrication, erection n alignment of stair, platform handrailing, steel lader railing, from ground to 26 mtr level, jig side of ps5 building, ps6 n ps14 water reservoir stair at rajrappa washery
Providing, dismantling, repairing, fabrication, erection n alignment of stair, platform handrailing, steel lader railing, from ground to 26 mtr level, jig side of ps5 building, ps6 n ps14 water reservoir stair at rajrappa washery
Read moreFabrication/erection and repairing of safety railing at 15 mtr level of old bunker side, including repairing of main ladders of old bunker side 0-0 to 9 mtr level front side in rlb section at kathara washery
Fabrication/erection and repairing of safety railing at 15 mtr level of old bunker side, including repairing of main ladders of old bunker side 0-0 to 9 mtr level front side in rlb section at kathara washery
Read moreReplacement of scrapper chain, repairing of head n tail sprocket assay of 522 chain conveyor, dismantling, fabrication, and erection n alignment of top, side and bottom liners of 522 chain conveyors at main washing plant at rajrappa washery project
Replacement of scrapper chain, repairing of head n tail sprocket assay of 522 chain conveyor, dismantling, fabrication, and erection n alignment of top, side and bottom liners of 522 chain conveyors at main washing plant at rajrappa washery project
Read moreProviding, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Read moreProviding , dismantling, fabrication, erection and alignment of damage structure and shade of head drum of 1204 and 1304 and between silo 8 and 9 at loading section of rajrappa washery
Providing , dismantling, fabrication, erection and alignment of damage structure and shade of head drum of 1204 and 1304 and between silo 8 and 9 at loading section of rajrappa washery
Read moreRepair maintenance of all the sldb installed on the each floor of main building for lighting control at the ps - 5 main building, ps - 4, ps - 8 n 9, ps - 11, ps - 14 and also providing n testing of lighting accessories under rajrappa washery
Repair maintenance of all the sldb installed on the each floor of main building for lighting control at the ps - 5 main building, ps - 4, ps - 8 n 9, ps - 11, ps - 14 and also providing n testing of lighting accessories under rajrappa washery
Read moreDismantling, fabrication and erection of reject bunker stair and railing at 9 mtr level in rcb 0-0 of kathara washery
Dismantling, fabrication and erection of reject bunker stair and railing at 9 mtr level in rcb 0-0 of kathara washery
Read moreof your Industry type