Tender Details

Particulars Details
Title
Providing, Dismantling, Repairing, Fabrication, Erection N Alignment Of Stair, Platform Handrailing, Steel Lader Railing, From Ground To 26 Mtr Level, Jig Side Of Ps5 Building, Ps6 N Ps14 Water Reservoir Stair At Rajrappa Washery
Description
Providing, Dismantling, Repairing, Fabrication, Erection N Alignment Of Stair, Platform Handrailing, Steel Lader Railing, From Ground To 26 Mtr Level, Jig Side Of Ps5 Building, Ps6 N Ps14 Water Reservoir Stair At Rajrappa Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318784_1
Reference
Number
GM(R)/SO(W)/Rjp/24-25/Et/61dt 07.10.24
Tender Fee 0
EMD 12100
Tender Value -
Place RAJRAPPA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330413

Start Date October 09, 2024 23:30
End Date
Expired 18/10/2024

Expired 727 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Fabrication, erection n alignment of suction pipe and short piece pipe of different size for pumps under pump section at rajrappa washery

Read more
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.

Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.

Read more
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project

Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project&#x0d &#x0d

Read more
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.

Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.

Read more
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Read more
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Dismantling, overhauling, repairing, assembling, erection, alignment,&#x0d testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Read more
Repairing of sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project

Repairing of&#x0d sizing screens and replacement of 1400mm p/n, n/n belt under raw coal section of rajrappa washery project.

Read more
Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project

Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project

Read more
Amc of one year (365 days) for the work of dismantling, shifting, erection n alignment of motors of different circuit section) of electrical section of rajrappa washery project.

Amc of one year (365 days) for the work of&#x0d dismantling, shifting, erection n alignment of motors of different circuit&#x0d (section) of electrical section of rajrappa washery project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise