Tender Details

Particulars Details
Title
Providing, Dismantling, Repairing, Fabrication, Erection N Alignment Of Stair, Platform Handrailing, Steel Lader Railing, From Ground To 26 Mtr Level, Jig Side Of Ps5 Building, Ps6 N Ps14 Water Reservoir Stair At Rajrappa Washery
Description
Providing, Dismantling, Repairing, Fabrication, Erection N Alignment Of Stair, Platform Handrailing, Steel Lader Railing, From Ground To 26 Mtr Level, Jig Side Of Ps5 Building, Ps6 N Ps14 Water Reservoir Stair At Rajrappa Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318784_1
Reference
Number
GM(R)/SO(W)/Rjp/24-25/Et/61dt 07.10.24
Tender Fee 0
EMD 12100
Tender Value
Place RAJRAPPA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330413
Start Date October 09, 2024 23:30
End Date

18/10/2024 ( Expired 260 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project

Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.

Read more
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.

Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.

Read more
Fabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery

Fabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery

Read more
Dismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery

Dismantling, fabrication, erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 a n b belts and the other jobs as per requirement under raw coal section of rajrappa washery

Read more
Dismantling ,fabrication, erection and alignment of side frame of primary crusher a n b side and repairing overhauling of variable speed fluid coupling of apron feeder unit no 103 a n 103 b under raw coal section of rwp

Dismantling ,fabrication, erection and alignment of side frame of primary crusher a n b side and repairing overhauling of variable speed fluid coupling of apron feeder unit no 103 a n 103 b under raw coal section of rwp

Read more
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.

Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.

Read more
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.

Read more
Dismantling, repairing and alignment of pump and motor base of unit 612-3 heavy media pump at 11 mtr. level and vertical sump pump/ sala pump at 0 mtr. level at washery building at moonidih coal washery.

Dismantling, repairing and alignment of pump and motor base of unit 612-3 heavy media pump at 11 mtr. level and vertical sump pump/ sala pump at 0 mtr. level at washery building at moonidih coal washery.

Read more
Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project

Dismantling of old over head maintenance beams (joist) at ps 5 main washing plant n ps8 n 9 n fabrication, erection n alignment, of the same after providing extra supports for strengthening of structure at rajrappa washery project

Read more
Click Here to Download Dockets