Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing, Dismantling, Repairing, Fabrication, Erection N Alignment Of Stair, Platform Handrailing, Steel Lader Railing, From Ground To 26 Mtr Level, Jig Side Of Ps5 Building, Ps6 N Ps14 Water Reservoir Stair At Rajrappa Washery
|
| Description |
Providing, Dismantling, Repairing, Fabrication, Erection N Alignment Of Stair, Platform Handrailing, Steel Lader Railing, From Ground To 26 Mtr Level, Jig Side Of Ps5 Building, Ps6 N Ps14 Water Reservoir Stair At Rajrappa Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_318784_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/24-25/Et/61dt 07.10.24 |
| Tender Fee | 0 |
| EMD | 12100 |
| Tender Value | |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330413 |
| Start Date | October 09, 2024 23:30 |
| End Date |
Expired
18/10/2024
Expired 601 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.
Read moreDismantling, fabrication and erection of reject bunker stair and railing at 9 mtr level in rcb 0-0 of kathara washery
Dismantling, fabrication and erection of reject bunker stair and railing at 9 mtr level in rcb 0-0 of kathara washery
Read moreProviding, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Providing, fabrication, erection n alignment of hand railing by welding to steel ladder railing ms tube 40mm at top up silo ps 8 n 9 (wc n wcp) bunker at rajrappa washery.
Read moreDismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.
Read moreDismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Dismantling, fabrication, erection n alignment of belt structure of 512 n 549 belt n discharge chute liner of 1001 n 513 belt under main washing plant of rajrappa washery project.
Read moreDismantling, overhauling, repairing, assembling, erection, alignment,testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Dismantling, overhauling, repairing, assembling, erection, alignment,
 testing of re circulation n fresh water 18 nos pumps installed different unit at pump section of rajrappa washery project.
Read moreDismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
Dismantling fabrication erection n alignment of tray n catch pan hopper liner plate n motor base of usl screen under main washing plant ps 5 of rajrappa washery project
 
Read moreDismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Dismantling, fabrication, erection and alignment of deck plates belt structures, repairing of roller frames related to belt conveyors under loading section of rajrappa washery project.
Read moreof your Industry type