Tender Details

Particulars Details
Title
Dismantling, Fabrication, Erection And Alignment Of Deck Plates Belt Structures, Repairing Of Roller Frames Related To Belt Conveyors Under Loading Section Of Rajrappa Washery Project.
Description
Dismantling, Fabrication, Erection And Alignment Of Deck Plates Belt Structures, Repairing Of Roller Frames Related To Belt Conveyors Under Loading Section Of Rajrappa Washery Project.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_325924_1
Reference
Number
GM(R)/SO(W)/Rjp/24-25/Et120 dt 16.01.25
Tender Fee 0
EMD 15200
Tender Value
Place RAJRAPPA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=337835
Start Date January 17, 2025 23:30
End Date

27/01/2025 ( Expired 145 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing and maintenance of dministrative office of the rajrappa project and rajrappa washery project under rajrappa area

Repairing and maintenance of dministrative office of the rajrappa project and rajrappa washery project under rajrappa area

Read more
Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in

Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in

Read more
Repairing/rehabilitation of 03 nos. telescopic lighting tower at east, west and coal section for ob/coal face illumination and 02 nos high mast tower dismantling and erection at west section and bws workshops of jayant, ncl.

Repairing/rehabilitation of 03 nos. telescopic lighting tower at east, west and coal section for ob/coal face illumination and 02 nos high mast tower dismantling and erection at west section and bws workshops of jayant, ncl.

Read more
Repairing and thorough overhauling of take-up drum u-1200 gear box of unit no. 66 belt conveyor and secondary double roll crusher in gear box sen-280 in raw coal section of kathara washery

Repairing and thorough overhauling of take-up drum u-1200 gear box of unit no. 66 belt conveyor and secondary double roll crusher in gear box sen-280 in raw coal section of kathara washery

Read more
(a)repair, fabrication and erection of dividing chute of unit no. 315-355 and 318-358 at 9mtr level in hydro cyclone section and (b)repair, fabrication and erection of suction pipe, railing and stair under water pump house and shifting and fit

(a)repair, fabrication and erection of dividing chute of unit no. 315-355 and 318-358 at 9mtr level in hydro cyclone section and (b)repair, fabrication and erection of suction pipe, railing and stair under water pump house and shifting and fit

Read more
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section

Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section

Read more
Fabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery

Fabrication and erection of pathway of unit no. 79 and 80 and side guard with channel angle plate etc changing and bressing in raw coal section at kathara washery

Read more
Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Dismantling fabrication erection n alignment of belt structure of 1204 n 1304 belt and trolley under loading section of rajrappa washery project.

Read more
(1) dismantling and erection of over head line 6.6kv due to extension for 7 seam akwmc,ocp under katras area-iv...

(1) dismantling and erection of over head line 6.6kv due to extension for 7 seam akwmc,ocp under katras area-iv...

Read more
Design fabrication supply and installation of frp trishul and damaru structures with illumination to support frames over the structural steel column support as per approved design on top of kailasagiri hill visakhapatnam

Design fabrication supply and installation of frp trishul and damaru structures with illumination to support frames over the structural steel column support as per approved design on top of kailasagiri hill visakhapatnam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise