Tender Details

Particulars Details
Title
And Design, Construction, Establishment And Development Of Solid Waste Processing Plant In 5 Towns As Per Bid Document For Ul Bs Under Swachh Bharat Mission
Description
And Design, Construction, Establishment And Development Of Solid Waste Processing Plant In 5 Towns As Per Bid Document For Ul Bs Under Swachh Bharat Mission
Organisation Government of Rajasthan
Tender Id 2023_DLB_338265_3
Reference
Number
36472
Tender Fee 5000
EMD 13.72 Lakh
Tender Value
Place DLB
Link https://eproc.rajasthan.gov.in
Start Date June 12, 2023 14:30
End Date

17/07/2023 ( Expired 672 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).

Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).

Read more
Construction / strengthening of mrf / composting plant under swachh bharat mission (urban) 2.0

Construction / strengthening of mrf / composting plant under swachh bharat mission (urban) 2.0

Read more
Mrf composting plant construction/renovation machine equipment supply and installation work under swachh bharat mission urban 2.0

Mrf composting plant construction/renovation machine equipment supply and installation work under swachh bharat mission urban 2.0

Read more
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service

Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Construction of solid waste processing and diposal facility center under sbm 2.0

Construction of solid waste processing and diposal facility center under sbm 2.0

Read more
Construction of proposed 25 tpd municipal waste processing plant...other ancillary works for proposed 25 tpd municipal waste processing plant under swatch bharat mission within ranaghat municipality.

Construction of proposed 25 tpd municipal waste processing plant...other ancillary works for proposed 25 tpd municipal waste processing plant under swatch bharat mission within ranaghat municipality.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise