Tender Details

Particulars Details
Title

AAAAAAAAAA

Login to view
Description
Emergent Restoration In Patches Of Mogra Keotsha Road From 5.10 Km. To 6.35 Km. 6.60 Km. To 7.95 Km. Under Barasat Highway Division I In The District Of North 24 Parganas.
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 25131
Tender Value
Place BASIRHAT
Link

AAAAAAAAAA

Login to view
Start Date April 28, 2025 14:30
End Date

13/05/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more
Upgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode

Upgradation of road kargil-dumgil (batalik road) from cl-9 to nhdl specifications from existing km 35.160 to km 49.754 (design chainage km 0.000 to km 14.594) under project vijayak, in ladakh (ut) on epc mode

Read more
Wbpwd/pw(r)/se/shc/nit no 04 of 2025-2026(sl-01)

Sankrail manikpur hirapur bazar road, from 0.00 km to 3.00 kmp, strengthening work and from 3.00 kmp to 6.30 km, surfacing work and 0.00km to 3.00 km. restoration work of phe cutting for laying pipe line under howrah highway division in the district

Read more
Wbpwd/pw(r)/se/shc/nit no 03 of 2025-2026(4th-call)

Sukanta setu(r.o.b) with approaches - replacement of damaged surface course and other allied works of repair and maintenance in footpath ,railing etc under alipore highway sub division under south 24 parganas highway division in the district of sout

Read more
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)

Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on

Read more

Ghospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call

Read more
Improvement strengthening of road from burighat to sermunii in tripura length15.862 km under nesidsroads on engineering procurement construction epc mode

Improvement strengthening of road from burighat to sermunii in tripura length15.862 km under nesidsroads on engineering procurement construction epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise