Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Outsourcing Of Jktdc Unit Kud Ii On A Ppp Mode
|
Description |
Outsourcing Of Jktdc Unit Kud Ii On A Ppp Mode
|
Organisation | Tourism | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 16.31 Lakh |
Tender Value | |
Place | Kud |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 14:30 |
End Date |
09/09/2025 ( 61 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Outsourcing of pahalgam club and pahalgam hutments on a ppp mode
Outsourcing of pahalgam club and pahalgam hutments on a ppp mode
Read moreOutsourcing of unit sanasar hutments on a ppp mode
Outsourcing of unit sanasar hutments on a ppp mode&#x0d &#x0d
Read moreOutsourcing of jktdc unit kud-ii on a ppp mode
Outsourcing of jktdc unit kud-ii on a ppp mode
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreRefurbishment upgradation development operation and maintenance of the existing hospital at voc port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Refurbishment upgradation development operation and maintenance of the existing hospital at voc port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIntegrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode.
Integrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode
Read moreConstruction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Read moreof your Industry type