Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Development Of 4 Lane Flyover From Old Pune Naka To Boramani Naka On Nh 65 In Solapur City In The State Of Maharashtra (Km 0.000 To Km 9.813) On Hybrid Annuity Mode
|
| Description |
Development Of 4 Lane Flyover From Old Pune Naka To Boramani Naka On Nh 65 In Solapur City In The State Of Maharashtra (Km 0.000 To Km 9.813) On Hybrid Annuity Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_221644_1 |
|
Reference Number |
NHAI/MH/Tech/Flyover/Pune Naka Boramani Naka/2024 |
| Tender Fee | 90000 |
| EMD | 8.35 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=246751 |
| Start Date | December 27, 2024 23:00 |
| End Date |
Expired
25/03/2025
Expired 570 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreUpgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Upgradation from intermediate 2-lane ps to 2-4 lane ps of kharibari ghoshpukur portion of nh-327c in the state of west bengal on hybrid annuity mode under nh(o)
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreConstruction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Construction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Read moreConsultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Consultancy services for ie for 4-laning of cuncolim to bendordem (including cuncolim bypass) section of nh-66 from km 561.480 to km 570.190 in the state of goa on hybrid annuity mode.
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreof your Industry type