Tender Details
Particulars | Details |
---|---|
Title |
107(w)/Edcs/2023 24
|
Description |
Shifting Of Line Of Two Lane Bridge On Sampar Sankhya 341 Slp/T 3 (Miranpur Katra Lucknow Muradabad Railway Line) Katra Nigohi In Full Deposite Head Under Edd Tilhar Under Edc Shahjahanpur (Mvvnl)
|
Organisation | Madhyanchal Vidyut Vitran Nigam Ltd | State Govt. and UT |
Tender Id | 2024_MVVNL_896198_1 |
Reference Number |
107(W)/EDCS/2023-24 |
Tender Fee | 1180 |
EMD | 4350 |
Tender Value | |
Place | SHAHJAHANPUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1540856 |
Start Date | February 14, 2024 14:30 |
End Date |
20/02/2024 ( Expired 480 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pmc for supervision, monitoring etc for construction of rail over bridge on railway level crossing no 341 spl between katra nigohi on lucknow delhi moradabad rail route under katra development block in distt shahjahanpur under crif scheme
Pmc for supervision, monitoring etc for construction of rail over bridge on railway level crossing no 341 spl between katra nigohi on lucknow delhi moradabad rail route under katra development block in distt shahjahanpur under crif scheme
Read moreSupply of de-centralized materials and shifting of 11 kv line under ground line at 11 kv dhauha feeder and 11 kv lic feeder under bridge no. 482/ railway sampar 122 near railway crossing chunar under deposit scheme edd-chunar, mirzapur
Supply of de-centralized materials and shifting of 11 kv line under ground line at 11 kv dhauha feeder and 11 kv lic feeder under bridge no. 482/ railway sampar 122 near railway crossing chunar under deposit scheme edd-chunar, mirzapur
Read more107(w)/edcs/2023-24
Shifting of line of two lane bridge on sampar sankhya 341-slp/t-3 (miranpur-katra-lucknow-muradabad railway line) katra nigohi in full deposite head under edd-tilhar under edc shahjahanpur (mvvnl)
Read more30(w)/edcs/2023-24
11 kv lt and ht line shifting from lucknow-delhi-muradabad rail line between nigohi and tilhar on railway sampar number 334 b, 2 lane bridge, in full deposite head under edd-tilhar under edc shahjahanpur (mvvnl
Read more30(w)/edcs/2023-24
11 kv lt and ht line shifting from lucknow-delhi-muradabad rail line between nigohi and tilhar on railway sampar number 334 b, 2 lane bridge, in full deposite head under edd-tilhar under edc shahjahanpur (mvvnl)
Read moreof your Industry type