Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Renovation And Painting With Construction Of Kitchen Of Adarsha Vidyalaya Sangathan At Piradhara Under Tapattary Block In Bongaigaon District Assam
|
| Description |
Repair Renovation And Painting With Construction Of Kitchen Of Adarsha Vidyalaya Sangathan At Piradhara Under Tapattary Block In Bongaigaon District Assam
|
| Organisation | Public Works Building and NH Department | State Govt. and UT |
| Tender Id | 2024_PWBNH_35811_1 |
|
Reference Number |
SE(N)/27/2023-24/Pt/436 |
| Tender Fee | 1000 |
| EMD | 1.04 Lakh |
| Tender Value | |
| Place | Bongaigaon |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58543 |
| Start Date | January 30, 2024 22:45 |
| End Date |
Expired
20/02/2024
Expired 882 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRepairing / renovation and painting of old functional adarsha vidyalaya (adarsha vidyalaya dokuchi) at dokuchi in kamrup district
Repairing / renovation and painting of old functional adarsha vidyalaya (adarsha vidyalaya dokuchi) at dokuchi in kamrup district
Read moreRepair renovation and painting of old functional adarsha vidyalaya building at barkhetri in nalbari district
Repair renovation and painting of old functional adarsha vidyalaya building at barkhetri in nalbari district
Read moreRenovation of existing infrastructure of rangapathar adarsha vidyalaya in charaideo district, assam
Renovation of existing infrastructure of rangapathar adarsha vidyalaya in charaideo district, assam
Read moreConstruction of adarsha vidyalaya at tokradia, hajo in kamrup district, assam
Construction of adarsha vidyalaya at tokradia, hajo in kamrup district, assam
Read moreConstruction of teachers residential quarter in existing adarsha vidyalayas under samagra shiksha, assam at adarsha vidyalaya, ganakkuchi under barpeta block in barpeta district
Construction of teachers residential quarter in existing adarsha vidyalayas under samagra shiksha, assam at adarsha vidyalaya, ganakkuchi under barpeta block in barpeta district
Read moreof your Industry type