Tender Details

Particulars Details
Title
Widening And Strengthening/ Reconstruction Of Nawadih (Dak Bangla) (Mdr 73) Vendra Gomoh (Laxmipur) Road (Total Length 11.530 Km) For The Year 2023 24 Under Road Division Bokaro
Description
Widening And Strengthening/ Reconstruction Of Nawadih (Dak Bangla) (Mdr 73) Vendra Gomoh (Laxmipur) Road (Total Length 11.530 Km) For The Year 2023 24 Under Road Division Bokaro
Organisation Government of Jharkhand
Tender Id 2023_CECOM_77529_1
Reference
Number
RCD/ BOKARO/ 1229/ 2023-24
Tender Fee 10000
EMD 25.64 Lakh
Tender Value
Place Chairman e-Procurement Cell RCD Jharkhand Ranchi
Link https://jharkhandtenders.gov.in
Start Date November 10, 2023 17:30
End Date

01/12/2023 ( Expired 536 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call

Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Gopiballavpur nayagram road from 35.00 km to 41.60km

Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.

Read more
Widening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)

Widening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)

Read more
Wbpwd/pw(r)/sepd/piu-i/nit-08 of 2025-2026,sl-1

Widening and strengthening of ayeshbagh - harirampur road from 0.00 kmp to 17.20 km under murshidabad highway division no. i in the district of murshidabad under ridf xxx. (2nd call)

Read more
Supply and installation of solar powered mobile lift irrigation scheme _3 h.p_ 50 nos_ under sdmf for the year 2023-24 to be implemented by boko chaygaon division irrigation boko

Supply and installation of solar powered mobile lift irrigation scheme _3 h.p_ 50 nos_ under sdmf for the year 2023-24 to be implemented by boko chaygaon division irrigation boko

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise