Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbmad/N Ie T/359/Bm/25 26/Apas
|
| Description |
Construction Of Drain At H/O Biplab Mitra To H/O Kalghat Road In Ward No. 20, Booth No 240 Within Bongaon Municipality Under The Scheme Of Amader Para, Amader Samadhan (Apas).
|
| Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
| Tender Id | 2026_MAD_5013499_1 |
|
Reference Number |
WBMAD/NIeT/359/BM/25-26/APAS |
| Tender Fee | 0 |
| EMD | 3660 |
| Tender Value | - |
| Place | BONGAON MUNICIPALITY |
| Link |
View Original Tender Notice
https://tenders.wb.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=5080511 |
| Start Date | March 10, 2026 00:25 |
| End Date |
Expired
16/03/2026
Expired 209 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps-vii stage-bm-enquiry for supply of helical gear boxes for eerm (emitting electrode rapping mechanism) of esps
Tggenco-ktps-vii stage-bm-enquiry for supply of helical gear boxes for eerm (emitting electrode rapping mechanism) of esps
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreTggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreTggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreTggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreWbmad/niet/213/bm/2025-26/apas
Installation of 30watt led street lights with 6.0 mtr. steel tubular pole at h/oashoke pal to h/o babul ghosh, booth no. 221 ward no.14 within bongaon municipality under the scheme of amader para amader samadhan (apas)
Read moreWbmad/niet/208/bm/2025-26/apas
Installation of 45watt led street lights with 7.0 mtr. steel tubular pole h/o himaddri mukherejee, booth no.183 ward no.05 within bongaon municipality under the scheme of amader para amader samadhan (apas)
Read moreof your Industry type