Tender Details

Particulars Details
Title
Supply, Erection And Commissioning Of New Quad Body No. 1 560 M2 Hsa In Season 2023 24
Description
Supply, Erection And Commissioning Of New Quad Body No. 1 560 M2 Hsa In Season 2023 24
Organisation Government of Uttar Pradesh
Tender Id 2023_TKSCT_820355_1
Reference
Number
KSCM-TILHAR/448/13.07.2023
Tender Fee 590
EMD 1 Lakh
Tender Value
Place KSCM TILHAR
Link https://etender.up.nic.in
Start Date July 13, 2023 22:30
End Date

19/07/2023 ( Expired 700 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan

One time improvement of riding quality of left out portions of nh-08 beawar gomti pkg-1 jawaja (new km 74/300 to 76/900) and balacharat (new km 101/300 to 102/400) in the state of rajasthan

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b

Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b

Read more
Supply, installation, testing and commissioning of new ductable air conditioner with replacement of old ductable air conditioner at mansarometro depot, main line (msor sicp) and both rss of jmrc

Supply, installation, testing and commissioning of new ductable air conditioner with replacement of old ductable air conditioner at mansarometro depot, main line (msor sicp) and both rss of jmrc

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise