Tender Details
Particulars | Details |
---|---|
Title |
Selection Of Agency For Operation And Maintenance (O And M) Of (20 To 35) Nos. Vehicles With Water Sprinkling Machine For A Period Of (3 Plus 2) Years
|
Description |
Selection Of Agency For Operation And Maintenance (O And M) Of (20 To 35) Nos. Vehicles With Water Sprinkling&Amp#X0d
Machine For A Period Of (3 Plus 2) Years
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_1025416_1 |
Reference Number |
05-04-2025/NAGAR NIGAM AGRA/18-04-2025 |
Tender Fee | 23600 |
EMD | 15 Lakh |
Tender Value | |
Place | AGRA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852653 |
Start Date | April 05, 2025 19:30 |
End Date |
18/04/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagarup
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 353 plus 542/lhs/ ghazipur/ uttar pradesh
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreRfp for selection of operator for o and m of container freight station cfs facility of conware (punjab state container and warehousing corporation limited) at dronagiri node plot 2 sector 2 navi mumbai, nhava sheva, maharashtra on ppp mode
Rfp for selection of operator for o and m of container freight station cfs facility of conware (punjab state container and warehousing corporation limited) at dronagiri node plot 2 sector 2 navi mumbai, nhava sheva, maharashtra on ppp mode
Read moreof your Industry type