Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening And Widening Work Of Jugsana Baldev Baroli Kailash Nh 2 Road (Mdr173) At Ch. 14.250 To 37.800 In District Mathura
|
| Description |
Strengthening And Widening Work Of Jugsana Baldev Baroli Kailash Nh 2 Road (Mdr173) At Ch. 14.250 To 37.800 In District Mathura
|
| Organisation | Chief Engineer Agra Zone PWD Agra UP | State Govt. and UT |
| Tender Id | 2024_CEAGR_907588_1 |
|
Reference Number |
589/14M-AC/2023-24 dated 02-02-2024 |
| Tender Fee | 2354 |
| EMD | 50 Lakh |
| Tender Value | - |
| Place | Mathura |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1565286 |
| Start Date | February 29, 2024 17:30 |
| End Date |
Expired
06/03/2024
Expired 951 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening of etawah-mainpuri (nh-83) to vicharpura (nh-19)-via kendriya vidyalaya in barpura block, district etawah
Widening and strengthening of etawah-mainpuri (nh-83) to vicharpura (nh-19)-via kendriya vidyalaya in barpura block, district etawah
Read moreStrengthening and widening of nh-27 to bijaypur via abhaypur paler gorsiya road distt. chittorgarh
Strengthening and widening of nh-27 to bijaypur via abhaypur paler gorsiya road distt. chittorgarh
Read moreWidening and strengthening of bb nagar to simbhaoli (nh-9) tak via hingwara, ladpur, and bharna in district bulandshahr
Widening and strengthening of bb nagar to simbhaoli (nh-9) tak via hingwara, ladpur, and bharna in district bulandshahr
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 68.600 to km. 162.700 and km. 178.400 to km. 183.732 of nh-326 in the state of odisha under epc mode (package-1)
Read moreBalance work of widening and strengthening of nh 353c from km 227.00 to 243.00 total 16.00 km chodampalli to guddiguddam section of sakoli wadsa armori gadchiroli ashti allapalli sironcha road in gadchiroli district in the state of maharashtra on epc
Balance work of widening and strengthening of nh 353c from km 227.00 to 243.00 total 16.00 km chodampalli to guddiguddam section of sakoli wadsa armori gadchiroli ashti allapalli sironcha road in gadchiroli district in the state of maharashtra on epc
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreof your Industry type