Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Khalwa Goumukhdhana Approach Road L Equal 3.50 Km New Harsud To Devaldi Road L Equal 1.00 Km Bramhdhad Hatnora Road L Equal 3.50 Km I/C Shifting Of Ht/Lt Lines Pole And Transformer
|
| Description |
Construction Of Khalwa Goumukhdhana Approach Road L Equal 3.50 Km New Harsud To Devaldi Road L Equal 1.00 Km Bramhdhad Hatnora Road L Equal 3.50 Km I/C Shifting Of Ht/Lt Lines Pole And Transformer
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2024_PWDRB_336081_1 |
|
Reference Number |
CE 24/3/Gen-40/2023-24 Indore, Dated 26.02.2024 |
| Tender Fee | 21534 |
| EMD | 7.41 Lakh |
| Tender Value | |
| Place | KHANDWA |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=396747 |
| Start Date | February 27, 2024 17:30 |
| End Date |
Expired
05/03/2024
Expired 828 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of substation earthing, overhauling of power tf installation of double-circuit underground cables, and construction/strengthening of 11k ht/lt lines within the industrial area(phase-2) under the jurisdiction of edd-mughalsarai bp 2026-27.
Work of substation earthing, overhauling of power tf installation of double-circuit underground cables, and construction/strengthening of 11k ht/lt lines within the industrial area(phase-2) under the jurisdiction of edd-mughalsarai bp 2026-27.
Read moreQuantum of works involved in different work ( replacement of old and jarjar wire of 11 kv and lt. line, providing new transformer due to oveloading, replacement of old and jarjar battery and charger set and other protection
Quantum of works involved in different work ( replacement of old and jarjar wire of 11 kv and lt. line, providing new transformer due to oveloading, replacement of old and jarjar battery and charger set and other protection
Read moreQuantum of works involved in different work ( replacement of old and jarjar wire of 11 kv and lt. line, providing new transformer due to oveloading, replacement of old and jarjar battery and charger set and other protection related eqipments
Quantum of works involved in different work ( replacement of old and jarjar wire of 11 kv and lt. line, providing new transformer due to oveloading, replacement of old and jarjar battery and charger set and other protection related eqipments
Read moreConstruction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Construction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Read moreShifting of htoh line along the roadside of purulia barakar road at gosala more due to construction of rob bridge and widening of road over railway crossing under purulia division
Shifting of htoh line along the roadside of purulia barakar road at gosala more due to construction of rob bridge and widening of road over railway crossing under purulia division
Read moreConsultancy services for preparation of dpr for construction of road d-s-dbo from new to nhdl (ps) specification from km 0.00 to km 150.00 (in pkg i, ii, iii, iv and v) along eastern bank of shyok river in ut of ladakh
Consultancy services for preparation of dpr for construction of road d-s-dbo from new to nhdl (ps) specification from km 0.00 to km 150.00 (in pkg i, ii, iii, iv and v) along eastern bank of shyok river in ut of ladakh
Read moreLac ads sl1- construction of road and protection wall to 1. kundumon badharia t t i-kattuvila kundumon ela road 2.thachonam ela road in ward 12 of nedumpana gp
Lac ads sl1- construction of road and protection wall to 1. kundumon badharia t t i-kattuvila kundumon ela road 2.thachonam ela road in ward 12 of nedumpana gp
Read moreT/l arran. (street light/fan/tube/bulb/ socket/generator) on elec. pole insta. in differ. road and differ. pandaals/ kavariya que corridor/ que comp. etc in deoghar dist. on the occasion of shrawani mela 2026 from 29.07.2026 to 28.08.2026 (31 days).
T/l arran. (street light/fan/tube/bulb/ socket/generator) on elec. pole insta. in differ. road and differ. pandaals/ kavariya que corridor/ que comp. etc in deoghar dist. on the occasion of shrawani mela 2026 from 29.07.2026 to 28.08.2026 (31 days).
Read moreConstruction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Read moreA/r and m/o to various road under srd project division-i /sub division-ii, during 2026-27 (desilting of system no.13 from pradesh karyalaya at ddu marg to outfall at system no.12 along mahawat khan road parallel to ddu marg, new delhi).
A/r and m/o to various road under srd project division-i /sub division-ii, during 2026-27 (desilting of system no.13 from pradesh karyalaya at ddu marg to outfall at system no.12 along mahawat khan road parallel to ddu marg, new delhi).
Read moreof your Industry type