Tender Details
Particulars | Details |
---|---|
Title |
Mtc. And Shifting Of Ht And Lt Poles And Lines Exists In The Alignment Of Plots/Gates And Acsr Insulated Conductor Of Size 30 Sqmm For Street Light Phase In Various Sectors U/E Kaithal. (Including One Year Free Mtc./ Defect Liability Period Free Of C
|
Description |
Mtc. And Shifting Of Ht And Lt Poles And Lines Exists In The Alignment Of Plots/Gates And Acsr Insulated Conductor Of Size 30 Sqmm For Street Light Phase In Various Sectors U/E Kaithal. (Including One Year Free Mtc./ Defect Liability Period Free Of C
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2024_HBC_404077_1 |
Reference Number |
20242A5AA8EE 8B77 460B B2CF 9E7F4319D117245HSV |
Tender Fee | 1430 |
EMD | 3060 |
Tender Value | |
Place | Kaithal |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=480505 |
Start Date | October 15, 2024 22:30 |
End Date |
23/10/2024 ( Expired 231 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ge/khu-46/2023-26 repair/ maint of ht distribution network incl acsr conductor poles insulators gods and connected accessories from pdd sub stn khaltsi to lamayuru military area and repair/ maint of mcbs dbs sub main wiring and electrical fitt
Ge/khu-46/2023-26 repair/ maint of ht distribution network incl acsr conductor poles insulators gods and connected accessories from pdd sub stn khaltsi to lamayuru military area and repair/ maint of mcbs dbs sub main wiring and electrical fitting in
Read moreShifting of ht/lt lines obstructed in the construction of master plan roads of tps-04 village nipaniya and kanadiya of ida indore
Shifting of ht/lt lines obstructed in the construction of master plan roads of tps-04 village nipaniya and kanadiya of ida indore
Read moreConstruction of parking, pavement and roads, water supply, sewerage and storm water drainage in shopping centre, sector-31, panchkula complete in all respects including 3 years defect liability and mtc. free of cost
Construction of parking, pavement and roads, water supply, sewerage and storm water drainage in shopping centre, sector-31, panchkula complete in all respects including 3 years defect liability and mtc. free of cost
Read moreConstruction of rcc retaining wall at 45m wide circular road sector 3, 4, 5, pinjore kalka urban complex from rd 1070 to 1150 including 3 years mtc. and defect liability period free of cost.
Construction of rcc retaining wall at 45m wide circular road sector 3, 4, 5, pinjore kalka urban complex from rd 1070 to 1150 including 3 years mtc. and defect liability period free of cost.
Read moreSpecial repair of 30 mtr. wide road 18mtr. wide road and 15 mtr. wide road sector-27, panchkula extension including three year mtc. and defect liability period free of cost.
Special repair of 30 mtr. wide road 18mtr. wide road and 15 mtr. wide road sector-27, panchkula extension including three year mtc. and defect liability period free of cost.
Read more02/25-26 - construction and commissioning of 200mm dia three phase tube well on annual rate contract basis in combination strata including defect liability period of two years in urban/rural area of division dholpur district dholpur
Construction and commissioning of 200mm dia three phase tube well on annual rate contract basis in combination strata including defect liability period of two years in urban/rural area of division dholpur district dholpur
Read moreJob no. 66.2025 hewp mtc. of all hort. works of shrub plants in green belt pocket no. i and ii in sec 25 and central verge no i on dividing road of sec 33 p i and sec 14 p ii developed under urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreJob no. 67.2025 hewp mtc. of all hort. works of tree plants s t p sec 14 p ii and shrub plants on central verge no. ii sec 14 p ii developed under urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreSpecifications and general instructions for the supply and delivery of top hampers for pcc poles 9 mtrs, to be used in ht/lt lines of distribution systems in punjab state power corporation limited.
The supply and delivery of top hampers for pcc poles 9 mtrs, to be used in ht/lt lines of distribution systems in punjab state power corporation limited.
Read more07/25-26rate contract for installation of single phase tube well 150mm nominal dia bore hole in combination strata complete with material and labour charges including 02 year defect liability period of division bharatpur, bayana, weir and nadbai dist
Rate contract for installation of single phase tube well 150mm nominal dia bore hole in combination strata complete with material and labour charges including 02 year defect liability period of division bharatpur, bayana, weir and nadbai district bha
Read moreof your Industry type