| Title |
Shifting Of Ht And Lt Poles And Lines Exists In The Alignment Of Plots In Various Sectors U/E Karnal. (Including One Year Free Mtc./ Defect Liability Period Free Of Cost). (Recall)
|
| Description |
Shifting Of Ht And Lt Poles And Lines Exists In The Alignment Of Plots In Various Sectors U/E Karnal. (Including One Year Free Mtc./ Defect Liability Period Free Of Cost). (Recall)
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2024_HBC_396239_1 |
|
Reference Number |
202456DF0FDE 589D 4A11 9B34 FECDCB503D02245HSV |
| Tender Fee | 1680 |
| EMD | 12700 |
| Tender Value | - |
| Place | Karnal |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=472550 |
| Start Date | August 01, 2024 22:30 |
| End Date |
Expired
08/08/2024
Expired 797 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 1 nos. 200 kva transformer exists in the alignment of plots in sector-33 u/e karnal.(rates taken in dnit exclusive gst)
Shifting of 1 nos. 200 kva transformer exists in the alignment of plots in sector-33 u/e karnal.(rates taken in dnit exclusive gst)
Read moreRepair of 200 kva transformer and shifting of 1 no. 200 kva transformer and other allied work in sector 32 karnal.(rates taken in dnit exclusive gst). (including one year free mtc. and defect liability period free of cost)
Repair of 200 kva transformer and shifting of 1 no. 200 kva transformer and other allied work in sector 32 karnal.(rates taken in dnit exclusive gst). (including one year free mtc. and defect liability period free of cost)
Read moreProviding illumination 12.5 mtr. long high mast with led flood lights 200 watt in sector 32,u/e karnal.(rates taken in dnit exclusive gst). (including three years free mtc. and defect liability period free of cost)
Providing illumination 12.5 mtr. long high mast with led flood lights 200 watt in sector 32,u/e karnal.(rates taken in dnit exclusive gst). (including three years free mtc. and defect liability period free of cost)
Read moreDevelopment of road, providing water supply, sewerage, tertiary water, storm water scheme in sector-27, pinjore - kalka, urban complex, panchkula including three year mtc. and defect liability period free of cost.
Development of road, providing water supply, sewerage, tertiary water, storm water scheme in sector-27, pinjore - kalka, urban complex, panchkula including three year mtc. and defect liability period free of cost.
Read moreReinvited job no. 323.2026 raising of boundary wall of park near h. no. 1203 old housing board, sec 1 and 4, hisar with one year maintenance and defect liability free of cost
Detailed estimate for annual mtc. estimate of horticulture works in sector-1and4, hisar for the year 2026-2027.
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreProviding grid connected roof top solar power plant (without battery bank) in office building sector 13 at hisar. including comprehensive maintenance defect liability period for period 7 years for complete plant free of cost. excluding gst.
Providing grid connected roof top solar power plant (without battery bank) in office building sector 13 at hisar. including comprehensive maintenance defect liability period for period 7 years for complete plant free of cost. excluding gst.
Read moreHew-16 supply and installation of bollard light at various parks of sector-46 ward no.20, badkhal constituency. including 5 years defect liability period, on/off of lights and watch and ward free of cost.
Supply and installation of bollard light at various parks of sector-46 ward no.20, badkhal constituency. including 5 years defect liability period, on/off of lights and watch and ward free of cost.
Read moreShifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Shifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Read moreWriting of serial numbers on balance l.t. pcc poles including painting of background and supply and erection of 25 watt and 72 watt led street lights in various sectors at hisar and all other works contingent thereto. including 3 years defect liabili
Writing of serial numbers on balance l.t. pcc poles including painting of background and supply and erection of 25 watt and 72 watt led street lights in various sectors at hisar and all other works contingent thereto. including 3 years defect liabili
Read moreof your Industry type