Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1300075460 R,1300040919 R,1300040920 R,1031071 R,1300075460 A,1300040919 A,1300040920 A,1031071 A
|
| Description |
|
| Organisation | Materials Department | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2025/B/5968357 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 18, 2025 22:44 |
| End Date |
Expired
28/02/2025
Expired 580 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreHiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Hiring of 2wd tyre mounted loader (backhoe) for 12 hrs availability, 250 hrs per month for a period of 2 years for rgoc-2
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read more1300075460 horizontal lifeline system w/t ppe/inst,1300040919 retractable block,1300040920 full bod
Read more
1300040919 retractable block,1300075654 safety harness with energy absorber,1300075657 ss wheel tro
Read more
300040918 horizontal life line upto 15 mts with installation and including trolley,1300040919 retra
Read more
Annual plan-kmc.pro.no 98/2024-25- m a h i n d r a r o a annual plan-kmc.pro.no 98/2024-25- m a h i n d r a r o a d r e t a r r i n gd r e t a r r i n g
Annual plan-kmc.pro.no 98/2024-25-&#x0d m a h i n d r a r o a d r e t a r r i n g
Read moreShishu mandiram r o a d r e t a r r i n g w a r d 7 o f c h e n d a m a n g a l a m g r a m a panchayath
Shishu mandiram r o a d r e t a r r i n g w a r d 7 o f c h e n d a m a n g a l a m g r a m a panchayath
Read moreof your Industry type