Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Manufacturing And Supply Of Flash Tank I With Steam Collectors For 210 Mw Lmw Design Turbine As Per Drawing 1 No
|
| Description |
Manufacturing And Supply Of Flash Tank I With Steam Collectors For 210 Mw Lmw Design Turbine As Per Drawing 1 No
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_421060_1 |
|
Reference Number |
CE MTPS I EE SI AEE I OT 172 2023 24 |
| Tender Fee | 0 |
| EMD | 18250 |
| Tender Value | - |
| Place | MTPS-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=500528 |
| Start Date | February 09, 2024 19:50 |
| End Date |
Expired
26/02/2024
Expired 962 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit design, fabrication, erection & commissioning and testing of 2000 cu meter capacity dm water storage tank service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit design, fabrication, erection & commissioning and testing of 2000 cu meter capacity dm water storage tank service provider
Read moreManufacture and supply of flash tank i with steam collectors for 210 mw lmw design turbine as per drawing 1 no
Manufacture and supply of flash tank i with steam collectors for 210 mw lmw design turbine as per drawing 1 no
Read moreSupply of sealing rings for 210mw lmw design turbine 10 items as per the specification
Supply of sealing rings for 210mw lmw design turbine 10 items as per the specification
Read moreSupply of main oil pump spares for 210mw lmw design turbine in unit i ii and iii
Supply of main oil pump spares for 210mw lmw design turbine in unit i ii and iii
Read moreMtps i tm 210mw lmw design turbine dismantling inspection and overhauling of speeder gear assembly of governing system
Mtps i tm 210mw lmw design turbine dismantling inspection and overhauling of speeder gear assembly of governing system
Read moreTtps mech ii tm i unit ii inspection of tg bearings of 210mw lmw design turbine during annual overhaul 2024 2025
Ttps mech ii tm i unit ii inspection of tg bearings of 210mw lmw design turbine during annual overhaul 2024 2025
Read moreMtps i tm unit ii removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2024 25
Mtps i tm unit ii removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2024 25
Read moreTtps mech ii tm i unit iii inspection of tg bearings of 210mw lmw design turbine during annual overhaul 2024 2025
Ttps mech ii tm i unit iii inspection of tg bearings of 210mw lmw design turbine during annual overhaul 2024 2025
Read moreMtps i tm unit ii removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2024 25
Mtps i tm unit ii removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2024 25
Read moreTtps mech ii tm i unit ii inspection of tg bearings of 210mw lmw design turbine during the forthcoming annual overhaul
Ttps mech ii tm i unit ii inspection of tg bearings of 210mw lmw design turbine during the forthcoming annual overhaul
Read moreof your Industry type