Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Tm 210 Mw Lmw Design Turbine Dismantling Inspection And Overhauling Of Speeder Gear Assembly Of Governing System
|
Description |
Mtps I Tm 210 Mw Lmw Design Turbine Dismantling Inspection And Overhauling Of Speeder Gear Assembly Of Governing System
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_530098_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT.309 / 2024-25 |
Tender Fee | 0 |
EMD | 500 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631142 |
Start Date | March 05, 2025 23:00 |
End Date |
19/03/2025 ( Expired 101 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreRoutine, breakdown, prive maintenance and overhauling jobs mechanical works of turbine, generator and their auxiliaries, hpbp, lpbp, regenerative system, condenser, piping, valves etc of ghtp, lehra mohabbat
Routine, breakdown, prive maintenance and overhauling jobs mechanical works of turbine, generator and their auxiliaries, hpbp, lpbp, regenerative system, condenser, piping, valves etc of ghtp, lehra mohabbat
Read moreSupply of spares for high pressure turbine control valves of 210 mw lmw design turbine for unit-i
Supply of spares for high pressure turbine control valves of 210 mw lmw design turbine for unit-i
Read moreSupply of spares such as sealing ring and flat springs for 210 mw lmw high pressure turbine for unit i
Supply of spares such as sealing ring and flat springs for 210 mw lmw &#x0d high pressure turbine for unit i
Read moreSupply of spares such as sealing ring and flat springs etc for 210 mw lmw low pressure turbine for unit i
Supply of spares such as sealing ring and flat springs etc for 210 mw lmw low pressure turbine for unit i
Read moreAdditional estimate for annexe i building with ancillary works and additional outside work of new assam legislative assembly complex at dispur as per revised design proposal
Additional estimate for annexe i building with ancillary works and additional outside work of new assam legislative assembly complex at dispur as per revised design proposal
Read moreMtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Read moreTtps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of mill gear box, under bowl, separator top assembly etc., of mills during the forthcoming overhaul
Read moreNctps i se mii circle echs dn overhauling and reconditioning of belt feeder gear box of ratio 1 140 0855 for shore unloaders i and ii at coal berth i of kpl
Nctps i se mii circle echs dn overhauling and reconditioning of belt feeder gear box of ratio 1 140 0855 for shore unloaders i and ii at coal berth i of kpl
Read moreTtps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Read moreof your Industry type