Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit Ii Removal And Re Insulation Of 210 Mw Lmw Design Turbine And Its Auxiliaries During Coh 2024 25
|
| Description |
Mtps I Tm Unit Ii Removal And Re Insulation Of 210 Mw Lmw Design Turbine And Its Auxiliaries During Coh 2024 25
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_453268_1 |
|
Reference Number |
CE/ MTPS-I/ SE/ M-I/TM/ OT. 01 / 2024-25 |
| Tender Fee | 0 |
| EMD | 27000 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539488 |
| Start Date | June 10, 2024 23:30 |
| End Date |
Expired
24/06/2024
Expired 842 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtpsi tm i unit ii annual maintenance work in main turbine its auxiliaries and overhauling of alfa laval centrifuges 2a 2b during 2026 27
Mtpsi tm i unit ii annual maintenance work in main turbine its auxiliaries and overhauling of alfa laval centrifuges 2a 2b during 2026 27
Read moreSupply of shims, certain tools and consumables for upcoming capital overhaul of main turbine and its auxiliaries
Supply of shims, certain tools and consumables for upcoming capital overhaul of main turbine and its auxiliaries
Read moreTtps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines, valves during the forthcoming annual overhaul
Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines, valves during the forthcoming annual overhaul
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreConstruction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.
Construction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.
Read moreMtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Read moreMtps i mill plant ac plant unit ii aoh 2026 27 air washer system epoxy painting of blowers and its auxiliaries fabrication of ms tank for cleaning of w type eliminators spray nozzles flushing works providing handrails in air washer circulating
Mtps i mill plant ac plant unit ii aoh 2026 27 air washer system epoxy painting of blowers and its auxiliaries fabrication of ms tank for cleaning of w type eliminators spray nozzles flushing works providing handrails in air washer circulating
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreof your Industry type