Tender Details

Particulars Details
Title
Ttps Mech Ii Tm I Unit I 210 Mw Lmw Turbine Replacement Of Wornout Intermediate Turbine Gland Sealing Rings Including Inspection Of Tg Bearing No 1 To 5 During The Forthcoming Annual Overhaul
Description
Ttps Mech Ii Tm I Unit I 210 Mw Lmw Turbine Replacement Of Wornout Intermediate Turbine Gland Sealing Rings Including Inspection Of Tg Bearing No 1 To 5 During The Forthcoming Annual Overhaul
Organisation Government of Tamil Nadu
Tender Id 2023_EB_403774_1
Reference
Number
CE/TTPS/SE/M-II/No.334/2023-24
Tender Fee 0
EMD 50000
Tender Value
Place O/o SE M II / TTPS
Link https://tntenders.gov.in
Start Date December 27, 2023 19:45
End Date

22/01/2024 ( Expired 481 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26

Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26

Read more
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Read more
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.

Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.

Read more
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site

Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site

Read more
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Read more
Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii

Ttps mech ii ahp repair and reconditioning of ip diaphragms 14th to 23rd stage of 210mw lmw design turbine released from unit iii

Read more
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026

Read more
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26

Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26

Read more
Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26

Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise