Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
12/R I/Ps/Sbmg /2025 26 (3rd Call)
|
| Description |
Construction Of Integrated Settler With Abr At End Point Of Drain At Village Daulatpur Under Hurshi Gp
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2025_ZPHD_892389_2 |
|
Reference Number |
12/R-I/PS/SBMG /2025-26 (3rd Call) |
| Tender Fee | 500 |
| EMD | 5413 |
| Tender Value | |
| Place | DAULATPUR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2012936 |
| Start Date | August 19, 2025 23:30 |
| End Date |
Expired
26/08/2025
Expired 329 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of integrated settler with abr at village kallaiya drain end point.
Construction of integrated settler with abr at village kallaiya drain end point.
Read moreConstruction of integrated settler with abr at ashurali market drain end point. (mouza-ashurali
Construction of integrated settler with abr at ashurali market drain end point. (mouza-ashurali
Read more12/r-i/ps/sbmg /2025-26 (2nd call)
Construction of integrated settler with abr at end point of drain at village daulatpur under hurshi gp
Read moreConstruction of integrated settler with abr at tenntulmuri village
Construction of integrated settler with abr at tenntulmuri village under nikunjapur gp under onda panchayat samity mouza tentulmuri jl no 138
Read moreConstruction of integrated settler with abr at village chandabila .
Construction of integrated settler with abr at village chandabila .
Read moreConstruction of integrated settler with abr at village chandabila .
Construction of integrated settler with abr at village chandabila .
Read moreof your Industry type