Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
N Ie T 100/23 24/01
|
| Description |
Construction Of Boundary Wall Along With Land Development And Plinth Protection And Approach Road For Pump House At Head Work Site Of Gangapur W/S Scheme, Block Pathar Pratima Under Jjm Of Kakdwip Sub Division Under Alipore Division, P.H.E. Dte.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2023_PHED_633572_1 |
|
Reference Number |
- |
| Tender Fee | 0 |
| EMD | 66591 |
| Tender Value | - |
| Place | Pathar Pratima Block |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1357857 |
| Start Date | December 30, 2023 16:30 |
| End Date |
Expired
22/01/2024
Expired 986 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreNiet-23/23-24/01
Supplying, fitting, fixing and delivery of different dia. specials for augmentation of haradhanpur (zone-ii) w/s scheme under jjm, block- sagar under kakdwip sub-division of alipore division, p.h.e. dte.
Read moreNiet-24/23-24/01
Sinking of 01 no. 250mm x 150mm dia. 360 mtr. deep replacement tubewell by d.r. rig method using upvc pipe and pre-packed resin bonded gravel filter at head work site of kusumtala w/s scheme, block- namkhana for implementation of jjm (2nd call)
Read moreNiet-100/23-24/09
Construction of boundary wall along with land development, plinth protection and approach road for pump house at 2nd tubewell site of dakshin durgapur w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.h.e.
Read moreNiet-100/23-24/13
Construction of boundary wall along with land development, plinth protection and approach road for pump house at 2nd tubewell site of dakshin surendraganj w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.
Read moreNiet-100/23-24/12
Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site of dakshin surendraganj w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.
Read moreNiet-100/23-24/14
Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site of uttar surendraganj w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.h.
Read moreNiet-100/23-24/11
Construction of boundary wall along with land development, plinth protection and approach road for pump house at 2nd tubewell site of ramnagar abad w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.h.e. dte
Read moreNiet-100/23-24/10
Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site of ramnagar abad w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.h.e. dte
Read moreNiet-100/23-24/15
Construction of boundary wall along with land development, plinth protection and approach road for pump house at 2nd tubewell site of uttar surendraganj w/s scheme, block pathar pratima under jjm of kakdwip sub-division under alipore division, p.h.
Read moreof your Industry type