Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
N Ie T 100/23 24/09
|
| Description |
Construction Of Boundary Wall Along With Land Development, Plinth Protection And Approach Road For Pump House At 2nd Tubewell Site Of Dakshin Durgapur W/S Scheme, Block Pathar Pratima Under Jjm Of Kakdwip Sub Division Under Alipore Division, P.H.E.
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2023_PHED_633572_9 |
|
Reference Number |
- |
| Tender Fee | 0 |
| EMD | 19164 |
| Tender Value | - |
| Place | Pathar Pratima Block |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1357944 |
| Start Date | December 30, 2023 16:30 |
| End Date |
Expired
22/01/2024
Expired 987 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreNiet-101/23-24/09
Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site for augmentation of nagendraganj (zone - i and ii) w/s scheme, block - sagar under jjm of kakdwip sub-division under al
Read moreNiet-94/23-24/09
Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site for augmentation of budhakhali zone - ii (part - i and ii) w/s scheme, block - namkhana under jjm
Read moreNiet-81/23-24/09
Construction of 1 (one) no. switch room cum chlorine room (4.88m x 3.66m) including sanitary arrangement as per departmental drawing at the site of matherdighi w/s scheme (zone-i, ii and iii), block - canning-ii (zone-iii, pump house no.- iii)
Read moreNiet-93/23-24/09
Construction of boundary wall along with land development and plinth protection and approach road for pump house at head work site of satyadaspur w/s scheme, block - pathar pratima under jjm of kakdwip sub-divn under alipore division, phe dte.
Read moreNiet-136/23-24/09
Construction, placing and fixing of fhtc platform at every individual beneficiary, pump connection etc. for augmentation of &#x0d srikrishnanagar w/s scheme, block - kakdwip for implementation of jjm under kakdwip sub-division of alipore division
Read moreNiet-56/23-24/09
Construction of temporary structures for phe staffs and fire fighting tank pump operators in connection with g.s. mela-2024 under kakdwip sub-division of alipore division, p.h. engineering dte.
Read moreNiet-55/23-24/09
Construction of temporary hogla structures for volunteer organization, structures made with gi sheet and temporary special latrine at different places of ganga sagar mela ground in connection with g.s. mela-2024 (at sagar mela ground)
Read moreNiet-57/23-24/09
Temporary hogla structure for press and temporary special latrine at different places of mela ground and o and m of 66 nos. latrine and 24 nos. urinal at k1 bus stand and laying brick flat soling at different structures i.c.w. g.s. mela 2024.
Read moreNiet-51/23-24/09
Construction of temporary wooden tower (7.50 mtr. height, 15 nos.) at different places at ganga sagar mela ground in connection with g.s. mela - 2024 under kakdwip sub-division of alipore division, p.h.e. dte.
Read moreof your Industry type