Tender Details
Particulars | Details |
---|---|
Title |
Work Of Di/Extension And Dismantling Of Lt Overhead Line Of Eastern Part I.E. Bramhaputra, 223, Bahanpat, Bhatora Patch, Naraibodh Patch Of Mines On As And When Required Basis For Quarry At Gevra Project For A Period Of 365 Days.
|
Description |
Work Of Di/Extension And Dismantling Of Lt Overhead Line Of Eastern Part I.E. Bramhaputra, 223, Bahanpat, Bhatora Patch, Naraibodh Patch Of Mines On As And When Required Basis For Quarry At Gevra Project For A Period Of 365 Days.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_332418_1 |
Reference Number |
SECL/GA/SOENM/ 24-25/E-TENDER/163 Dt. 12/03/2025 |
Tender Fee | 0 |
EMD | 2.22 Lakh |
Tender Value | |
Place | Gevra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344603 |
Start Date | March 17, 2025 15:30 |
End Date |
03/04/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Read moreThe dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
Read moreDay to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreDay to day erection ,dismantling and di of 3.3 kv overhead lines in various parts of mines at lajkura ocp,ib valley area for a period of 2 years
Day to day erection ,dismantling and di of 3.3 kv overhead lines in various parts of mines at lajkura ocp,ib valley area for a period of 2 years
Read moreDay-to-day di, shifting and extension of ht overhead lines of upper and lower kusmunda quarry for a period of one year at dipka expansion project.
Day-to-day di, shifting and extension of ht overhead lines of upper and lower kusmunda quarry for a period of one year at dipka expansion project.
Read moreDay to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.
Read moreExtn cum erection including di of 220/440v lt ohl req for illumination at different locations and as and when required for mine development and along with dismantling of lt ohl from different locations at quarry no. 01 and 02 under purnadih
Extn cum erection including di of 220/440v lt ohl req for illumination at different locations and as and when required for mine development and along with dismantling of lt ohl from different locations at quarry no. 01 and 02 under purnadih
Read moreDi /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Read moreExtension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Read moreof your Industry type