Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
|
Description |
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333117_1 |
Reference Number |
SECL/GA/SOENM/ 24-25/E-TENDER/171 Dt. 23/03/2025 |
Tender Fee | 0 |
EMD | 76100 |
Tender Value | |
Place | Gevra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345395 |
Start Date | March 26, 2025 15:30 |
End Date |
12/04/2025 ( Expired 9 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Empanelment with rate contract for hiring of different category of a.c./ non a.c. vehicles on as and when required basis for wcl hq, deployed under outstation duty for a period of two years (2x365 days.)
Empanelment with rate contract for hiring of different category of 
 a.c./ non a.c. vehicles on as and when required basis for wcl hq, 
 deployed under outstation duty for a period of two years (2x365 
 days.)
Read moreDay-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Read moreDay to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Read moreDay to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis
Day to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis
Read morePipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.
Pipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreDay to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.
Read moreDi /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days
Read moreDismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreExtension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Read moreof your Industry type