Tender Details

Particulars Details
Title
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
Description
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_333117_1
Reference
Number
SECL/GA/SOENM/ 24-25/E-TENDER/171 Dt. 23/03/2025
Tender Fee 0
EMD 76100
Tender Value
Place Gevra Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345395
Start Date March 26, 2025 15:30
End Date

12/04/2025 ( Expired 9 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Empanelment with rate contract for hiring of different category of a.c./ non a.c. vehicles on as and when required basis for wcl hq, deployed under outstation duty for a period of two years (2x365 days.)

Empanelment with rate contract for hiring of different category of &#x0d a.c./ non a.c. vehicles on as and when required basis for wcl hq, &#x0d deployed under outstation duty for a period of two years (2x365 &#x0d days.)

Read more
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.

Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.

Read more
Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.

Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.

Read more
Day to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis

Day to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis

Read more
Pipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.

Pipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.

Read more
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Read more
Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.

Day to day shifting and installation of pumps at east zone (bahanpat, bhatora, 522 coal face) sump as and when required basis in the gevra project for a period of 365 days.

Read more
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Read more
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.

Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.

Read more
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise