Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
|
Description |
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333117_1 |
Reference Number |
SECL/GA/SOENM/ 24-25/E-TENDER/171 Dt. 23/03/2025 |
Tender Fee | 0 |
EMD | 76100 |
Tender Value | |
Place | Gevra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345395 |
Start Date | March 26, 2025 15:30 |
End Date |
12/04/2025 ( Expired 58 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing works of non inverter model air conditioners split and type voltage stabilizers refrigerators geyser coolers blowers heaters sterilizers and mortuary units on as and when required basis of gnh ranchi for period of 365 days
Repairing works of non inverter model air conditioners split and type voltage stabilizers refrigerators geyser coolers blowers heaters sterilizers and mortuary units on as and when required basis of gnh ranchi for period of 365 days
Read moreDay to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days
Day to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days
Read moreWork of collection of samples for coal as fired basis from 4x210mw for day to day heat rate calculation and operation activities as when required coal samples from feeder of each unit mill reject of all units
Work of collection of samples for coal as fired basis from 4x210mw for day to day heat rate calculation and operation activities as when required coal samples from feeder of each unit mill reject of all units
Read moreErection of different size of steel tubular poles at different locations for installation of cctv at various weigh bridges, boom barriers and coal stocks on as and when required basis under dipka expansion project.
Erection of different size of steel tubular poles at different locations for installation of cctv at various weigh bridges, boom barriers and coal stocks on as and when required basis under dipka expansion project.
Read moreDay to day annual maintenance work of 132/33kv power transformer, 132kv sf6 bkr, 33kv vcb, 33kv mocb, switchyard isolators and other substations equipment at 132/33kv grid sub-station, nandira under gm unit jagannath area as and when req for 365 days
Day to day annual maintenance work of 132/33kv power transformer, 132kv sf6 bkr, 33kv vcb, 33kv mocb, switchyard isolators and other substations equipment at 132/33kv grid sub-station, nandira under gm unit jagannath area as and when req for 365 days
Read moreRewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Read moreFabrication and erection of different sizes of new pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near pontoon at different sumps of balram ocp, hingula area for a period of 365
Fabrication and erection of different sizes of new pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near pontoon at different sumps of balram ocp, hingula area for a period of 365
Read moreThe work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
Read moreEmpanelment with rate contract for hiring of different category of a.c./ non a.c. vehicles on as and when required basis for wcl hq, deployed under outstation duty for a period of two years (2x365 days.)
Empanelment with rate contract for hiring of different category of 
 a.c./ non a.c. vehicles on as and when required basis for wcl hq, 
 deployed under outstation duty for a period of two years (2x365 
 days.)
Read moreRepair of both rear brake group of 10 nos. 100t dumpers and water sprinklers on as and when required basis of khadia project within a period of 365 days.
Repair of both rear brake group of 10 nos. 100t dumpers and water sprinklers on as and when required basis of khadia project within a period of 365 days.
Read moreof your Industry type