Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
|
Description |
Day To Day Shifting And Installation Of Pumps At East Zone (Bahanpat, Bhatora, 522 Coal Face) Sump As And When Required Basis In The Gevra Project For A Period Of 365 Days.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333117_1 |
Reference Number |
SECL/GA/SOENM/ 24-25/E-TENDER/171 Dt. 23/03/2025 |
Tender Fee | 0 |
EMD | 76100 |
Tender Value | |
Place | Gevra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345395 |
Start Date | March 26, 2025 15:30 |
End Date |
12/04/2025 ( Expired 31 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Read moreFabrication and erection of different sizes of new pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near pontoon at different sumps of balram ocp, hingula area for a period of 365
Fabrication and erection of different sizes of new pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near pontoon at different sumps of balram ocp, hingula area for a period of 365
Read moreThe work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
Read moreEmpanelment with rate contract for hiring of different category of a.c./ non a.c. vehicles on as and when required basis for wcl hq, deployed under outstation duty for a period of two years (2x365 days.)
Empanelment with rate contract for hiring of different category of 
 a.c./ non a.c. vehicles on as and when required basis for wcl hq, 
 deployed under outstation duty for a period of two years (2x365 
 days.)
Read moreRepair of both rear brake group of 10 nos. 100t dumpers and water sprinklers on as and when required basis of khadia project within a period of 365 days.
Repair of both rear brake group of 10 nos. 100t dumpers and water sprinklers on as and when required basis of khadia project within a period of 365 days.
Read moreDay-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Read moreDay to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis
Day to day mechanical maintenance work of road weighbridges of ananta ocp for a period of two years on as and when required basis
Read moreDay to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Read morePipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.
Pipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreof your Industry type