Tender Details
Particulars | Details |
---|---|
Title |
Di/Extension And Dismantling Of Lt Overhead Lines Of Central Patch Including Godhara Patch And Anand Vatika, Old Pn H Patch Of Mine As And When Required Basis For Quarry At Gevra Project For 365 Days.
|
Description |
Di/Extension And Dismantling Of Lt Overhead Lines Of Central Patch Including Godhara Patch And Anand Vatika, Old Pn H Patch Of Mine As And When Required Basis For Quarry At Gevra Project For 365 Days.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_315964_1 |
Reference Number |
SECL/GA/SO ENM/24-25/E-TENDER/93 dt. 26/08/2024 |
Tender Fee | 0 |
EMD | 2.21 Lakh |
Tender Value | |
Place | Gevra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327434 |
Start Date | August 28, 2024 15:30 |
End Date |
14/09/2024 ( Expired 250 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of dg/service van and cutting for delivery ranges of pump installed at bkb old sump and quarry 2 under ask oc
Repairing of leakages, dismantling of damaged pipelines and laying of fresh/new pipes on as and when required basis with own arrangement of dg/service van and cutting for delivery ranges of pump installed at bkb old sump and quarry 2 under ask oc
Read moreRewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Rewinding,repairing, dismantling and installation of ceiling fans and exhaust fans as and when required basis at different locations of bhubaneswari ocp for a period of 365 days
Read more(a) erection of continuous earth conductor in the ht over head line of various feeders from 5 mva s/s at ashok patch (14.3 km) (b) erection and dismantling of ht oh line as and when required basis for production related activity as per requirement of
(a) erection of continuous earth conductor in the ht over head line of various feeders from 5 mva s/s at ashok patch (14.3 km) (b) erection and dismantling of ht oh line as and when required basis for production related activity as per requirement of
Read more(a) erection of 220v lt o/h line lighting for haul road 9 seem and old deco patch of abocp mine (b) erection of earth wire/cradle guard for safety purpose 6.6 kv d/l feeder near jocp sub-station of abocp mine
(a) erection of 220v lt o/h line lighting for haul road 9 seem and old deco patch of abocp mine (b) erection of earth wire/cradle guard for safety purpose 6.6 kv d/l feeder near jocp sub-station of abocp mine
Read moreThe dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
Read moreDismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area
Dismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area
Read morePartial di, extension and dismantling of different delivery ranges as required for shifting and installation of delivery ranges of kathon patch due to madhucon work (haul road cutting/ di work) under purnadih ocp, nk area
Partial di, extension and dismantling of different delivery ranges as required for shifting and installation of delivery ranges of kathon patch due to madhucon work (haul road cutting/ di work) under purnadih ocp, nk area
Read moreDay to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Day to day shifting and installation of pumps at lk zone (lk1 and lk2) sump as and when required basis in the gevra project for a period of 365 days.
Read moreDay to day repair and maintenance of 3.3kv ohtl and 440v ohtl by dismantling, erection, extension for supplying power to hemms, mine dewatering pumps and lighting installations for one year as and when required as per the advancement of mine under da
Day to day repair and maintenance of 3.3kv ohtl and 440v ohtl by dismantling, erection, extension for supplying power to hemms, mine dewatering pumps and lighting installations for one year as and when required as per the advancement of mine under da
Read moreDay to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .
Read moreof your Industry type