Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting And Installation Of Pumps At West Zone (Pn H, Sadbhav, Old Dipka, Uk Sadbhav) Sump As And When Required Basis In Gevra Project For A Period Of 365 Days
|
Description |
Day To Day Shifting And Installation Of Pumps At West Zone (Pn H, Sadbhav, Old Dipka, Uk Sadbhav) Sump As And When Required Basis In Gevra Project For A Period Of 365 Days
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_335892_1 |
Reference Number |
SECL/GA/SOENM/ 25-26/E-TENDER/28 Dt. 20/05/2025 |
Tender Fee | 0 |
EMD | 64800 |
Tender Value | |
Place | Gevra Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348179 |
Start Date | May 23, 2025 15:30 |
End Date |
09/06/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreOffloading the work of repair and maintenance support in dumper and water sprinklers of krishnashila project on daily basis for period of 365 days
Offloading the work of repair and maintenance support in dumper and water sprinklers of krishnashila project on daily basis for period of 365 days
Read moreSupply of liquified petroleum gas in road tankers of each capacity 18 mt and quality conforming to is 4576 1999 reaffirmed in 2004 on as and when required basis for a period of one year
Supply of liquified petroleum gas in road tankers of each capacity 18 mt and quality conforming to is 4576 1999 reaffirmed in 2004 on as and when required basis for a period of one year
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreEngaging data entry operator for zonal office on daily basis for the period of 1 year in zone-12 through contract basis rs.718 x 365 days x 10 nos - rs.2620700.00 without gst
Engaging data entry operator for zonal office on daily basis for the period of 1 year in zone-12 through contract basis rs.718 x 365 days x 10 nos - rs.2620700.00 without gst
Read moreEngaging data entry operator for zonal office on daily basis for the period of 1 year in zone-12 through contract basis rs.718 x 365 days x 10 nos - rs.2620700.00 without gst
Engaging data entry operator for zonal office on daily basis for the period of 1 year in zone-12 through contract basis rs.718 x 365 days x 10 nos - rs.2620700.00 without gst
Read moreAnnual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year
Annual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of
 boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year
Read moreRepairing works of non inverter model air conditioners split and type voltage stabilizers refrigerators geyser coolers blowers heaters sterilizers and mortuary units on as and when required basis of gnh ranchi for period of 365 days
Repairing works of non inverter model air conditioners split and type voltage stabilizers refrigerators geyser coolers blowers heaters sterilizers and mortuary units on as and when required basis of gnh ranchi for period of 365 days
Read moreDay to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days
Day to day shifting and installation of pumps at west zone (pnh, sadbhav, old dipka, uk sadbhav) sump as and when required basis in gevra project for a period of 365 days
Read moreErection of different size of steel tubular poles at different locations for installation of cctv at various weigh bridges, boom barriers and coal stocks on as and when required basis under dipka expansion project.
Erection of different size of steel tubular poles at different locations for installation of cctv at various weigh bridges, boom barriers and coal stocks on as and when required basis under dipka expansion project.
Read moreof your Industry type