Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Bachhwal Link Road
|
| Description |
Reconstruction Of Bachhwal Link Road
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2025_CEUCZ_1014812_6 |
|
Reference Number |
451/E-Tender/2024-25 Date-18.02.2025 |
| Tender Fee | 800 |
| EMD | 2.1 Lakh |
| Tender Value | |
| Place | sitapur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1827514 |
| Start Date | March 07, 2025 17:30 |
| End Date |
Expired
22/03/2025
Expired 459 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of link road nevilgang bhadurpur road to nagla vidhi
Repairing of link road nevilgang bhadurpur road to nagla vidhi
Read moreDemolition and reconstruction of oht at ins mandovi
Demolition and reconstruction of oht at ins mandovi
Read morePreparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Preparation of dpr of road and bridge from ahmedabad road (govardhan-vilas) to sector 13-14 link road. 2303
Read moreRepairing of link road patna pul to yakubpur marg par aneso pul to ludhaura
Repairing of link road patna pul to yakubpur marg par aneso pul to ludhaura
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreUnder district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3
Under district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3&#x0d
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreReconstruction of damaged boundary wall facing seaside at 7m detachment okha under ge (navy) porbandar
Reconstruction of damaged boundary wall facing seaside at 7m detachment okha under ge (navy) porbandar 
Read moreWidening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Widening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Read moreRepair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Read moreof your Industry type