Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing, Lowering And Laying Of Main Gravity Drainage Line In Ravet At Adjacent Area Of City Pride School, Mhaske Vasti And Other Area.
|
| Description |
Providing, Lowering And Laying Of Main Gravity Drainage Line In Ravet At Adjacent Area Of City Pride School, Mhaske Vasti And Other Area.
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_PCMCP_928781_9 |
|
Reference Number |
DRAINAGE/HO/5/10/2023-24 |
| Tender Fee | 2397 |
| EMD | 27000 |
| Tender Value | - |
| Place | DRAINAGE DEPARTMENT PCMC PIMPRI |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | July 26, 2023 20:30 |
| End Date |
Expired
28/08/2023
Expired 1146 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of storm water drainage of bhagat singh chowk in bahadrabad block of haridwar city distt. haridwar
Construction of storm water drainage of bhagat singh chowk in bahadrabad block of haridwar city distt. haridwar
Read moreConstruction of storm water drainage outfall of raj rajeshwari colony dehradun city total lenth of outfall 12.50km
Construction of storm water drainage outfall of raj rajeshwari colony dehradun city total lenth of outfall 12.50km
Read moreConstruction of storm water drainage outfall of gandhi road district dehradun city total lenth of outfall 4.20km
Construction of storm water drainage outfall of gandhi road district dehradun city total lenth of outfall 4.20km
Read moreConstruction of storm water drainage and culvert at madathur north 1st street in west zone at thoothukudi city municipal corporation
Construction of storm water drainage and culvert at madathur north 1st street in west zone at thoothukudi city municipal corporation
Read moreDevelopment of bay-shed and land development for loading and unloading adjacent to feed go-down at matigara poultry plant, matigara, kaprail more siliguri darjeeling 734010 under w.b.l.d.c.l. lb-2, sector-iii, salt lake city, kolkata - 700106.
Development of bay-shed and land development for loading and unloading adjacent to feed go-down at matigara poultry plant, matigara, kaprail more siliguri darjeeling 734010 under w.b.l.d.c.l. lb-2, sector-iii, salt lake city, kolkata - 700106.
Read moreSelection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of city mote drain, associated drainage and service drain network in patna, bihar
Selection of consultant for preparation of detailed project report (dpr) for construction, improvement and interlinking of city mote drain, associated drainage and service drain network in patna, bihar
Read moreAddn/altn of 02 x or toilet block (p-02) a coy at certain mil unit, provn of control room to accommodation automation eqpt scada at certain mil unit, provn of drainage system approx length 300 mtrs with drain cover slabs adjacent to bldg no p-36 otm
As per tender docus
Read moreWidening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
Widening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type