Tender Details
Particulars | Details |
---|---|
Title |
Special Repair Of Deeha Link Road Km. 1 (565) In Financial Year 2024 25. (Vidhan Sabha Bahraich)
|
Description |
Special Repair Of Deeha Link Road Km. 1 (565) In Financial Year 2024 25. (Vidhan Sabha Bahraich)&Amp#X0d
|
Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
Tender Id | 2025_CEDPW_1011866_4 |
Reference Number |
819/13M/E-Tendering/2024-25 Dated-27-02-2025 |
Tender Fee | 856 |
EMD | 1.69 Lakh |
Tender Value | |
Place | Bahraich |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1816984 |
Start Date | February 27, 2025 23:30 |
End Date |
06/03/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read morePr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreAAAAAAAAAA
Login to viewConstruction of a rcc box bridge in replacement of old narrow bridge at chainage 25.90 km of tarapith birchandrapur hazipur mayureswar kotasur road under birbhum highway division-i, in the district of birbhum during the year 2024-25.
Read moreGe/khu-35/2025-26 spl repair to bldg no t- 74, special repair of bldg no t-32 tech stores, special repair of jcos living accn bldg no t-01 and special repair of damage earthing and cables of installation at khumbathang in the aor of age b/r-1 and a
Ge/khu-35/2025-26 spl repair to bldg no t- 74, special repair of bldg no t-32 tech stores, special repair of jcos living accn bldg no t-01 and special repair of damage earthing and cables of installation at khumbathang in the aor of age b/r-1 and a
Read morePeriodical repair of the road from darchawi road to the garden of miss lawmi darlong via tlangpar para total l 1 40 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 0 00 km to 1 00 km
Periodical repair of the road from darchawi road to the garden of miss lawmi darlong via tlangpar para total l 1 40 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 0 00 km to 1 00 km
Read morePr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read morePeriodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Read moreof your Industry type