Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Water Supply Facility In Bsf Campus Labana Jaipur Rajasthan
|
| Description |
Construction Of Water Supply Facility In Bsf Campus Labana Jaipur Rajasthan
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_BSF_768116_1 |
|
Reference Number |
61/NIT/EE/RAJ/2023-24 |
| Tender Fee | 0 |
| EMD | 93430 |
| Tender Value | |
| Place | IG FTR HQ BSF JODHPUR RAJASTHAN |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | August 23, 2023 16:45 |
| End Date |
Expired
31/08/2023
Expired 1057 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of water supply facility in bsf campus labana, jaipur (rajasthan). (sh-providing and fixing of submersible pump).
Construction of water supply facility in bsf campus labana, jaipur (rajasthan). (sh-providing and fixing of submersible pump).
Read moreConstruction of water supply facility in bsf campus labana jaipur rajasthan
As per schedule
Read moreConstruction of water supply facility in bsf campus labana jaipur rajasthan
As per schedule
Read moreRepair and maintenance of security lights installed at rhq 63 bn bsf campus labana under ftr hq bsf rajasthan.
Repair and maintenance of security lights installed at rhq 63 bn bsf campus labana under ftr hq bsf rajasthan.
Read moreof your Industry type