Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Retaining Wall On Main Road To Old Hariara Road Approx 15 Mtr. And One Small Culvert Under Mlalad Deposit Work Sh Construction Of 900mm Dia Hume Pipe Culvert And Construction Of Retaining Wall.
|
Description |
Construction Of Retaining Wall On Main Road To Old Hariara Road Approx 15 Mtr. And One Small Culvert Under Mlalad Deposit Work Sh Construction Of 900mm Dia Hume Pipe Culvert And Construction Of Retaining Wall.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_103443_13 |
Reference Number |
23-73 dated 02-04-2025 |
Tender Fee | 500 |
EMD | 5800 |
Tender Value | |
Place | FATEHPUR |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=151834 |
Start Date | April 08, 2025 16:30 |
End Date |
19/04/2025 ( Expired 50 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreSopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25
Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25
Read moreJjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Jjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Read moreJjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Jjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and other allied work etc. within the jurisdiction
Read moreJjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and
Jjm scheme under nalchar block/ sh construction of 8 (eight) nos. small bore deep tube well (sbdtw) (125mm x 100mm dia) along with installation of pump set, distribution of pipe line system and
Read moreof your Industry type