Tender Details

Particulars Details
Title
Construction Of Balance Work Of Additional T/F Plinth
Description
Construction Of Balance Work Of Additional T/F Plinth And Allied Civil Works &Amp#X0d At 66 Kv S/S South City
Organisation Department of Power | State Govt. and UT
Tender Id 2024_POWER_128739_1
Reference
Number
10/CWL/2024-25
Tender Fee 1770
EMD 11000
Tender Value
Place South city Ludhiana
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=261101
Start Date October 17, 2024 22:30
End Date

18/11/2024 ( Expired 226 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Read more
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Non comprehenssive biennial rate contract for di dr of epm alternator of under

Non comprehenssive biennial rate contract for di dr of epm alternator of under&#x0d construction boat sm6 and commissioned boats having mdl d448/gds liabilities&#x0d project p75

Read more
Indigenous development of restraining gear for aircraft carriers

Design ,development, manufacturing, testing, supply, preservation, installation, alignment, setting to work, commissioning, acceptance and trials of restraining gear and associated system and accessories for aircraft carriers, as per sotrs

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise